Site Characteristics

In the northern hemisphere, always orient the array to true south. In the southern hemisphere, always orient the array to true 
north. To optimize power output, verify that no object, including fencing,

 

trees, buildings and/or other obstructions, will cause any 

shading of the array. 

Site Latitude Fixed Tilt Angle

0° to 25°

30°

25° to 30°

La5°

30° to 35°

La10°

35° to 40°

La 15°

> 40°

60°

Components that determine tilt

Simplified System Block Diagram

The PV module(s) convert solar energy into DC power which is then fed to the positive (+) and negative (–) terminals on the 
charge controller. The design of the charge controller allows for uniform charging of the battery bank and prevents overcharging 
conditions. The batteries provide power for loads appropriately rated for the battery string (12Vdc to 48Vdc).

PV Module Tilt

Refer to the accompanying table for recommended tilt angles. The tilt angle is set by the vertical distance (span) between the pole 
channels, the selection of an attachment point (a, b, or c) and the length of the strut.

For comprehensive information regarding installation and assembly of the Side-of-Pole mounting rack, refer to DPW Solar's 

 

Side-of-Pole Mount Assembly Instructions.

WARNING: Personal Injury

Use care while assembling the rack assembly. During the assembly procedure components could create hazards, obstructing 
free movement and leading to serious bodily injury. These hazards are at head/eye level. The use of head and eye protection is 
required.

IMPORTANT:

The SPM-1 racking system is designed for poles 2" to 3.5" in diameter. The SPM-2 and SPM-3 racking systems are designed for poles 
3" to 4.5" in diameter.

Mounting Rack Assembly

Item

Description

Quantity

1

Hose Clamp (standard)

4 per rack

2

Pole Channel

2 per rack

3

Module Rail (left and right)

2 per rack

4

3/8" x 1" hex bolt, lock washer, flat washers

6 sets per rack

5

Strut

2 per rack

6

1/4" x 3/4" hex bolt, lock washer, flat washers, nut

4 sets per rack

Item

Description

1

Pole Channel

2

Module Rail (left and right)

3

Strut (left and right)

Attachment Points

a

b

c

Span

2

1

1

3

Tools required for racking assembly:

•  7/16" wrench for 1/4" module hardware

•  9/16" wrench for 3/8" hardware

•  Torque wrench (optional, recommended)

•  Ratchet and extension bar

•  Safety eyewear

•  Safety headgear

PV  

modules

Charge Controller

PV Module breaker

(+)

( –)

 

PV

BATT

LOAD

Load circuit breaker

Load (+)

Load (–)

(–)

(+)

(–)

(+)

(–)

(+)

Battery breaker

Negative bus bar

Battery string(s)

1

2

4

5

1

2

4

4

4

4

4

5

3

3

6

6

6

6

Illustration courtesy of DPW Solar / Preformed Line Products

Illustration courtesy of DPW Solar / Preformed Line Products

IMPORTANT:

The size and capacity of the system determine which charge controller, 

either the SmartHarvest by OutBack  

SCCM20-100 MPPT or Morningstar TriStar MPPT-30

, is installed in the system.

 

Verify the particular make and model in 

the system and follow instructions in this and related product documentation

Summary of Contents for smartharvest

Page 1: ...ll Battery Owner s Manual OutBack Power Technologies p n 900 0127 01 00 Audience This guide is intended for experienced installers familiar with the mechanical and electrical requirements of photovolt...

Page 2: ...procedure components could create hazards obstructing free movement and leading to serious bodily injury These hazards are at head eye level The use of head and eye protection is required IMPORTANT T...

Page 3: ...attach the PV module to the rails 1 2 1 2 PV module SmartHarvest Charge Controller connections PV module positive Connect to the lower position of PV input circuit breaker PV module negative Connect...

Page 4: ...acid contacts skin or clothing wash immediately with soap and water If acid enters the eye immediately flood it with running cold water for at least 20 minutes and get medical attention as soon as po...

Page 5: ...Charge Controller connection detail including optional battery sense wiring and remote temperature sensor wiring Battery temperature sensor optional connect to battery terminal Battery sense wire conn...

Page 6: ...ads 2 Recharge battery Yellow LED not on Charge battery Charging to wrong voltage 1 Check position of battery selection jumper 2 Check installation of thermistor Load not powered Check minimum load fo...

Page 7: ...tive String 3 positive String 1 negative String 2 negative String 3 negative Load connections Battery bus to LVD positive LVD negative to negative bus bar LVD Load to Load output circuit breaker DC ou...

Page 8: ...Confirm the polarities of the PV module wiring and Battery string wiring are correct 2 Close the connected battery string breakers 1 through 3 3 Close the master battery disconnect The LEDs on the cha...

Page 9: ...0 Vdc indicating the system is offline A B C D IllustrationofMorningstarTriStarMPPT 30ChargeControllercourtesyofMorningstarCorp A PV module breaker B DC bus breaker C Low voltage disconnect LVD D Load...

Reviews: