13
Model No. 084-6693-4
TM
ASSEMBLY
STEP 6: Connecting the trampoline mat to the top rail frame
• Hang the Trampoline Mat (10) on the Top Rail Frame using the
provided Springs (11).
• Locate the Zipper Start/End in the trampoline mat and align it to the
T-joint (5). There is a red line pre-sewn at the V-ring straps. The T-joint (5)
will be placed between these two V-ring straps. When the position
confirmed; place 2 springs (11) as shown in below.
Zipper
Start/End
Red
Lines
084-6693.indd 13
12/5/2014 1:06:40 PM