background image

Disassembly

Packing the tent

Step 7 : Secure guy lines

1) Secure tent using all guy lines and stakes. 
     Tent must be secured for proper 
      function.

Step 5 : Stake tent

Fully assembled

Step 6 : Attach fly

Tent must be completely guyed out to  
prevent rain water from pooling on 
the roof/fly causing frame damage.

CTC201009-1     7/19

1) Stake down the tent by inserting a stake through the stake loops, located along the 
      perimeter of the tent.
2) Make certain the tent floor is pulled out evenly and tightly.
3) Hammer the stakes into the ground at a 45˚ angle using a hammer or mallet.

1) Unfold the fly and place over the tent. Position the fly with logo at the side of the tent.
2) Attach hook and loop tabs on the underside of the fly to the frame.
3) Attach S-hooks on the fly to D-rings on the leg poles.

1) To take down the tent, disassemble in 
     reverse order.
2) Remove accessories and items from inside
      and outside the tent. 
3) Remove and fold fly.
4) Be sure to leave doors and windows 
     unzipped to avoid zipper damage.
5) Remove stakes with hammer or stake 
     puller. DO NOT pull on tent.
6) Carefully disengage poles from pins. 
     Carefully push pole away from you through 
     the sleeve to minimize risk of damage to 
     tent or poles.
7) Store stakes in bags provided.

1) Spread tent flat, distribute evenly. 
2) Fold into quarters not to exceed the length 
     of pole bag.

3) Lay pole bag at opposite end from door. 
     Tightly roll bag, tent and fly forcing air 
      through unzipped door.

4) Secure with ties and place in carry bag with 
     stakes and accessories.
5) Tent must be clean and dry before storage. 
     Store off concrete floor.

Be certain campfires are extinguished. 

Dispose of trash appropriately.

Dimension A should
be close to but not
exceed the length
of the pole bag.

A

Fold tent into a

rectangular shape.

Front of tent

(door unzipped)

Made in Bangladesh
Imported by Trileaf Distribution Trifeuil Toronto, 
Canada M4S 2B8

3

2

Summary of Contents for CTC201009-1

Page 1: ...imum of two adults for assembly During assembly poles are under tension If not held firmly in place during assembly poles could break or flip up possibly causing serious injury Safety glasses may be w...

Page 2: ...in all poles are locked in the connectors 1 Place leg poles D at the front corners of the tent and insert the top of the pole into the bottom of the corner connectors on the tent Place the bottom of t...

Page 3: ...rder 2 Remove accessories and items from inside and outside the tent 3 Remove and fold fly 4 Be sure to leave doors and windows unzipped to avoid zipper damage 5 Remove stakes with hammer or stake pul...

Page 4: ...esive patch kit We recommend a canvas or awning repair shop for larger tears Zippers are self repairing If the zipper separates you can move the slider to the beginning of the zipper tape and rework t...

Page 5: ...balai et pelle insectifuge Soyez pr venant envers les autres tant les humains que la faune N oubliez pas de faire le m nage et d liminer vos d chets de fa on ad quate Ne laissez pas de trace DANGER Le...

Page 6: ...Pieds 4 A M t principal du toit 2 C Pieds du centre rouge 2 B M t central du toit gris 1 Double toit 1 INSTRUCTIONS D ASSEMBLAGE TENTE CABINE 6 PERSONNES Hangout No d article 076 5962 0 No de mod le C...

Page 7: ...tente doit tre fix e pour demeurer en place tape 6 Attachez le double toit 1 D pliez le double toit et placez le sur la tente Positionnez le double toit avec le logo sur le c t de la tente 2 Joignez l...

Page 8: ...une ponge et l aide de savon doux vaisselle ou de savon Fels au naphte Laissez s cher la tente compl tement Vous pouvez ensuite appliquer un compos hydrofuge sp cialement con u pour les tentes Pour le...

Reviews: