Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 24
64.
Attach
Side Facia
to Roof Rafter Ends.
There are two Side Facia pieces per side.
Secure with 8 - 1 1/4” finishing Nails per piece.
66.
Place First Roof Ridge Cap on roof peak overhanging shingles by approximately 2”. Attach with
2- 1 1/4” Shingle Nails 9” from end. Place 2nd Ridge Cap 1” back from 1st cap. Attach with 2- 1 1/4”
Shingle Nails 9” from end. There are left/right Ridge Caps, alternate each Ridge Cap as you proceed.
67.
Place 3rd Ridge Cap 8” back from 2nd. (enough to cover shingle
nails). Attach 3rd Ridge Cap down as per
Step 66
. Continue to position
and attach Ridge Caps until half roof is complete. From opposite side,
position and attach Ridge Caps as described above. Score/cut 1 Ridge
Cap to 12” or to fit in the center of roof. Attach center cap with 4 - 1 1/4”
Shingle Nails.
9” from end
Alternate left/right Ridge Caps
8”
8”
Undercourse
Rid Cap
65.
Attach
Gable Facia
to exposed plywood
of gable with 2 - 1 1/4” finishing nails. End of
gable facia will attach to side facia with
2 - finishing nails. Complete both sides.
Side Facia
and exposed
plywood.
Gable Facia