5.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
CAUTION:
You will need two people to assist you. Be careful not to bend or twist the floor when
laying floor down. When in place, level floor completely.
Flush with Floor Framing
4.
Attach
Floor Runners
to completed Floor Joist
Frame. There are two Floor Runners per 105” side and
three completed Floor Runners in total. Use 6 - 2 1/2”
screws per Runner to secure.
Front
Foundations
NOTE:
The floor will be flipped over and Floor
Runners will sit on your foundation. It is important to
note that having a level foundation is critical.
Choosing a foundation will vary between regions.
Typical foundations can be concrete pads or patio
stones positioned underneath the Floor Runners.
6.
Position
Plywood Floor
pieces (2) on top of completed Floor Joists. Plywood Floor pieces will
sit flush with outside of Floor Joist Frame.
Rear
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com sales@outdoorlivingtoday.com
Page 4