B-526-10N-E
31
10.1.4 Signal Generating Magnet Disassembly and Reassembly Notes
Phase observation is required for the signal generating magnet assembly. If installed out of phase at assembly,
the total counter will not count. Install the generating magnet assembly such that its locating pin is down when
the flow direction is from right to left; up when the flow direction is from left to right.
SEALING
FLANGE
(111)
(104)
SENSOR
OPENING
LOCATING PIN
SIGNAL MAGNET ASS'Y
ADAPTER
PRESSURETIGHT
SEALING PLATE
1ST ROTOR SHAFT
NOTE:
The adapter is installed correctly if its
locating pin opening is on the same
side as the signal magnet locating
pin.
LOCATING PIN HOLE
ADAPTER
(110)
Summary of Contents for ULTRA UF-II
Page 67: ...B 526 10N E 67...