“Regumaq X-25” Installation
23
138112581-V01.10.2019
NOTICE
Damage to property caused by system
overpressure!
The safety valve only protects the potable water
circuit within the fresh water station.
f
Also equip the potable water system with an
additional (without isolating facility) safety
valve in accordance with DIN EN 806-2.
NOTICE
Damage to property caused by frost or
overheating!
Frost or excessive ambient temperatures may
damage the station components
f
Install the station in a dry and frost-free
place. Make sure that the ambient tem-
perature during operation does not exceed
35 °C.
f
Before installing the station, make sure that
the
pipework to the installation location is laid,
fl ushed and leak tested.
f
Before installing the station, make sure that the
power cable and grounding cable are routed to the
installation location.
f
Always install the station in a vertical position – nev-
er in an inclined or lying position.
f
The station must always be accessible – even after
installation.
f
The station should be installed as closely to the buff-
er storage cylinder as possible. The pipe connection
must have a nominal diameter of at least DN 20.
6.2 Wall attachment of the station
6.2.1 Required tools
Wall attachment requires the following tools:
• Pipe wrench
• Spirit level
• Drill (8 mm masonry drill)
• 10 mm spanner / reversible ratchet with SW 10
socket wrench insert
• 32 mm spanner
• 38 mm spanner
• 4 mm key for screws with hexagon socket
• Marker pen
6.2.2 Installation
1. Pull the product out of the cardboard.
2. Lift off the upper shell (see Illust. 12)
Illust. 12: Removal of the front insulation shell
3. Remove the wall bracket.
Illust. 13: Removal of the wall bracket
4. Hold the wall bracket horizontally against the wall to
use it as a drilling jig.
5. Mark the spots for two holes