Fresh water station “Regumaq X-25”
Handover report
Date:
Installation site address / building
User address
Installation company address
“Regumaq X-25” serial number
If there are any steps you do not complete
or if you respond with ‘No’, please explain in
the comments field!
Tick as appropriate or
enter a value/number
Comments/settings
Yes
No
Installation of potable water station
1
Number of installed stations
2
Number of stations with circulation
3
Designation of circulation pump(s) when
not using the Oventrop circulation set.
4
When installing several stations
4.1
Was the Tichelmann system used for the
pipework?
¨
¨
4.2
Were check valves installed in the pota-
ble water supply (PWC)?
¨
¨
5
Was an additional safety valve with ade-
quate dimensions installed in the potable
water circuit?
¨
¨
6
System pressure on the potable water
side
bar
7
Was an expansion tank installed in the
potable water circuit?
¨
¨
8
System pressure on the storage cylinder
side
bar
9
Was the storage cylinder side bled?
¨
¨
10
Was the functionality of the bleeder(s)
checked?
¨
¨
11
Performance, type and version of the
heat generator
kW
12
Storage cylinder volume
l
13
Was/were the station(s) hydraulically
decoupled when connected?
¨
¨
14
When using Oventrop storage cylinders.
Has (Have) the station(s) been connected
according to the specifications?
¨
¨
15
Was an adequately dimensioned expan-
sion tank installed in the storage cylinder
circuit?
¨
¨
16
Which nominal temperature was set on
the heat generator for the storage cylin-
der?
°C
17
Are all ball valves open?
¨
¨