background image

Part Number 10400219-101 03/2009

©2009 Overland Storage, Inc.

Page 1 of 6

IMPORTANT:  Overland Storage requires that all NEO 
Series parts be removed and replaced by an Overland 

Storage authorized service provider. Improper installation may 
result in damage which voids existing warranties.

This document describes how to remove and replace either 
the front or rear Z-Axis assembly in a NEO 4000 or NEO 
4000

E

 library from Overland Storage.

You will need wire cutters, Phillips screwdrivers, and a 
Torque wrench.

WARNING:  The GUI touch screen does not completely 
shut off NEO Series system power. To reduce the risk of 
electric shock or damage, unplug both power cords.

Unpacking the Spare

Carefully unpack and verify that you have all the parts: 

Front or rear Z-Axis assembly

Four (4) M3x20mm panhead Phillips screws

Four (4) M3 cup washers

Two (2) M3x6mm panhead Phillips screws 

One (1) miniature cable tie (rear assembly only)

These instructions

Electrostatic Discharge Information

A discharge of static electricity can damage micro-circuitry 
or static-sensitive devices. To help prevent Electrostatic 
Discharge (ESD), observe standard ESD precautions.

Remove Library from Rack

1.

Remove all four tape 

magazines

.

IMPORTANT:  If the library is non-operational, the 
doors can be manually opened by pushing a stiff 

wire through the manual release holes (

Figure 1

).

Figure 1.  Manual Door Release Locations

2.

If operating, use the GUI to 

power down

 the library.

3.

Turn the 

power supply

 switches to OFF (O), and 

remove the 

power cords

.

4.

Remove all 

external host cables

.

5.

Also, to reduce weight, we recommend removing the 

drive assemblies

.

WARNING:  To prevent injury, it is recommended 
that a mechanical lifter (or at least two people) be 
used during rack installation or removal.

6.

Using a mechanical lifter (or two people), remove the 

unit

 from the rack and place it on a secure ESD 

surface.

Remove Top Covers

1.

Remove and retain the 

two screws

 securing the front 

top cover.

2.

Lift and remove the 

front

 top cover, and set aside.

3.

If replacing the 

rear

 Z-Axis assembly, also remove the

 

fan cover

 assembly at the top rear:

a.

Remove and retain the 

11 screws

 that secure the 

fan cover assembly to the library chassis.

b.

Carefully lift the inside edge of the 

fan cover 

assembly

 and disconnect the cooling fan connector.

CAUTION:  

Lifting the cover too far can cause a 

strain on the cables possibly damaging them or 
their connectors.

 

NEO

®

 4000 or 4000

E

Spare Z-Axis Assemblies

Remove & Replace Instructions

Overview & Notes

N

EO

-9

18

9

N

EO

-9

19

0

Front

Rear

Preparing the Library

N

EO

-0

15

5

Manual Release

Summary of Contents for NEO 4000

Page 1: ...ll four tape magazines IMPORTANT If the library is non operational the doors can be manually opened by pushing a stiff wire through the manual release holes Figure 1 Figure 1 Manual Door Release Locations 2 If operating use the GUI to power down the library 3 Turn the power supply switches to OFF O and remove the power cords 4 Remove all external host cables 5 Also to reduce weight we recommend re...

Page 2: ...tive Z Axis remove the four screws and washers Figure 4 securing the Screw Rail to the track plate NOTE If unscrewing the rear Z Axis screws retain the Screw Rail clamp from the bottom Figure 4 Remove the Z Axis Screw Rail Screws 3 If the track plate is stuck in a raised position on the other Z Axis remove the four screws and washers Figure 4 securing the Screw Rail and carefully lower the track p...

Page 3: ... Figure 9 Turn Front Z Axis Motor Coupler Inside View c Install the four new M3x20mm screws and M3 washers until snug then loosen them one turn NOTE The screws are tighten during the final unit test Be sure the cup washer is positioned correctly with the cup side up against the screwhead Figure 10 Figure 10 Screw and Cup Washer Assembly IMPORTANT Continue with Power On and Test the Library on page...

Page 4: ...ctor to the bottom of the Z Axis drive motor 3 Using two new M3x6mm screws secure the Z Axis assembly to the two top mounting holes 4 Install new cable tie to secure the cables to the motor Figure 16 observing these points Cables in rear must be clear of the pulleys Locate the Tie ratchet away from the Screw Rail Trim the excess tie leader that extends beyond the tie ratchet Figure 16 Cable Tie an...

Page 5: ...etained clip onto the bracket to secure the flex cable Figure 21 Verify that the flex cable is in the appropriate slot and that the clip is positioned in the notches Figure 21 Retaining Clip Notches Flex Cable Slot 7 Reinstall the Fan Cover a Carefully reposition the Fan Cover assembly over the opening and move it slightly toward the front to permit the deflector to enter the cavity b Reconnect th...

Page 6: ...Next in the same order tighten the screws to around 6 lbs torque 3 Reconnect the power cords turn on the power supplies and tap the GUI to power on the library 4 Press Menu Diagnostics Vertical Calibration Initial Calibration 5 Verify that all the demand results are less than 100 6 Press Final Calibration 7 Verify that all the demand results are less than 100 IMPORTANT If any results are over 100 ...