background image

 

244

9.61  

 

127

5.00  

2

kit contains 2 assemblies

4

5

1

3

2

117

  4.62  

 

2.0 max

1.5 min

5.00

 

127

 

244.16

9.61  

1.5 min

2.0 max

 

117

4.61  

6" Post to Beam (P2B-IW-6)

Item #: 51735

Scale: 1:4

51735

Product & Packaging Specs

1

Last updated: 4/29/2016

Weight: 3.43 LBS

V2.00 - Installation Instructions, Specifications and Project Plans are effective 4/29/2016 . This information is updated periodically 
and should not be relied upon after 2 years from 4/29/2016 . Please visit OZCOBP.com to get current information.

ITEM 

NO.

QTY.

PART 

NUMBER

DESCRIPTION

1

0.08

56626

OWT Timber 

Screw 2-3/4"

2

0.4

56621

1 1/2" Hex 

Cap Nut 

(HCN)

3

0.08

56627

OWT Timber 

Screw 3-3/4"

4

1

51710-11

Ledge, Post to 

Beam

5

1

51735-11

Plate, Top 6" 

Post to Beam

Summary of Contents for P2B-IW-6

Page 1: ...00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ITEM NO QTY PART NUMBER DESCRIPTION 1 0 08 56626 OWT Timber Screw 2 3 4 2 0 4 56621 1 1 2 Hex Cap Nut HCN 3 0 08 56627 OWT Timber Screw 3 3 4 4 1 51710 11 Ledge Po...

Page 2: ...ging Specs Scale 1 4 Last updated 4 29 2016 2 V2 00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ...

Page 3: ...ging Specs Scale 1 4 Last updated 4 29 2016 3 V2 00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ...

Page 4: ...e 1 2 Last updated 4 29 2016 4 V2 00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ...

Page 5: ...e 1 2 Last updated 4 29 2016 5 V2 00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ...

Page 6: ...e 1 4 Last updated 4 29 2016 6 V2 00 Installation Instructions Specifications and Project Plans are effective 4 29 2016 This information is updated periodically and should not be relied upon after 2 years from 4 29 2016 Please visit OZCOBP com to get current information ...

Reviews: