MAINTENANCE INSTRUCTIONS
KMW150CCD
Version 1
USER MANUAL
KMW150CCD Chiller v1.1.doc
Page
18
8. Maintenance Instructions
8.1 Filling the Reservoir with Water
Task Time:
10 minutes
When:
When the FLOW light on the front panel is illuminated
Tools:
Bucket
Funnel
25 Litres of clean distilled water (maximum amount required if reservoir is empty)
Procedure
1. Switch off the KMW150CCD.
2. Remove the power supply plug from the electricity socket.
WARNINGS
Ensure that the power is switched off at the mains and that the plug
has been disconnected from the mains power supply before removing
the top of the KMW150CCD. Dangerous voltages are present on the
KMW150CCD’s terminals when the power is on. Rotating parts are
exposed when the top of the KMW150CCD is removed when the
power is on.
3. Remove the top of the KMW150CCD and locate the filling inlet.
4. Remove the inlet cover.
WARNING
Do not allow water to splash on the electrical circuits of the
KMW150CCD. Failure to prevent water coming into contact with the
electrical circuits could cause an electrical shock hazard, and
possible damage to the equipment.
5. Using the funnel carefully fill the reservoir, trying to avoid splashing, until the water overflows
through the overflow pipe.
6. Refit the inlet cover.
7. Refit the top panel of the KMW150CCD.