background image

 

Maintenance operations 

 11 

 

4. Checking turnstile units 

 
 

4.1. Clean turnstile parts from contaminants. 

 

4.2. Check if all the cables are properly connected. 

 

4.3.  Check  and  tighten  if  necessary  thread  connections  that  fasten 

turnstile units. 

5. Lubricating moving parts of turnstile mechanisms 

To get an access to the assemblies, for lubrication of the moving parts of 
turnstile mechanisms it is required to:

 

1. Remove lower decorative board having undone two screws 1 
(Fig.6)

 

2. Remove arms unit - to get this: 

2.1. Unscrew fixation lock 2 with box spanner D22 

2.2. Loose a screw М8, which is in the hole where the fixation lock 
was secured with hexagonal key S6. 

2.3. Loose two screws 1 (Fig.4) М8 with hexagonal key S6 

2.4. Remove arms unit. 

Lubricate the details of the turnstile mechanism (Fig.7) indicated with 
numbers 1, 2, 3 and 4. 

Lubricating is performed by engine oil of viscosity grade 5W-20 at a rate 
of 2 - 3 drops in each slide assembly. 
 
 

 

Summary of Contents for Cube C-01

Page 1: ...Maintenance operations www oxgard com info oxgard com Tel 7 812 366 15 94 Cube 01 turnstile...

Page 2: ......

Page 3: ...ctions 4 2 Conditions for performance of technical maintenance 5 3 Partial disassembly of the turnstile 5 4 Checking turnstile assemblies 11 5 Lubricating sliding parts of turnstile mechanisms 11 6 As...

Page 4: ...uld there be any failure MO should be performed immediately after repair works 1 3 During MO it is recommended to carry out the work by two qualified mechanical and electrical engineers acquainted wit...

Page 5: ...trongly forbidden to unfasten a cross board located under the indication panel Otherwise the manufacturer will terminate the validity of warranty for the product ATTENTION It is not recommended to adj...

Page 6: ...wo screws 1 and four screws 2 smoothly move the backshell up at a small distance so that not to break the cable coming to the indication board Fig 2 Disconnect the cable from the indication board Move...

Page 7: ...Maintenance operations 7 Fig 2 Move up...

Page 8: ...rther work to achieve this retract fixation lock 2 of the crossbars Fig 3 and while holding one crossbar in a fixed position rotate the other crossbar by the other hand clockwise so that all the cross...

Page 9: ...Maintenance operations 9 Fig 4...

Page 10: ...Cube 01 turnstile 10 Fig 5...

Page 11: ...urnstile mechanisms it is required to 1 Remove lower decorative board having undone two screws 1 Fig 6 2 Remove arms unit to get this 2 1 Unscrew fixation lock 2 with box spanner D22 2 2 Loose a screw...

Page 12: ...Cube 01 turnstile 12 Fig 6...

Page 13: ...Maintenance operations 13 Fig 7...

Page 14: ...r s manual and is available on the web site www oxgard com 6 2 In case of repair of damaged painted surfaces one should use powder paint identical to the damaged RAL9005 guiding the instructions for i...

Page 15: ...Maintenance operations 15...

Page 16: ...OOO Vozrozhdenie 66 Sofiyskaya str 192289 Saint Petersburg tel fax 7 812 336 15 94 www oxgard com info oxgard com...

Reviews:

Related manuals for Cube C-01