background image

 

Cube С-01 turnstile 

 14 

6. Assembly and functionality test of the turnstile 

 

6.1.  In  case  some  faults  of  its  units  are  detected  in  the  process  of 

turnstile  TM  it  is  recommended  to  consult  the  customer  care.  List  of 

addresses  of  the  official  dealers  and  service  centers  is  provided  in  the 

Operator’s manual and is available on the web-site: www.oxgard.com 

6.2.  In  case  of  repair  of  damaged  painted  surfaces  one  should  use 

powder  paint,  identical  to  the  damaged  (RAL9005),  guiding  the 

instructions for its use. 

 

6.3. Fulfill an assembly of the turnstile in the reverse order. 

 

6.4.  Connect  the  power  of  the  turnstile  and  carry  out  functionality 

test, having done several test runs.  

 

6.5.  If  there  is  neither  abnormal  noise  nor  any  violations  of  the 

operation modes the turnstile is ready for operation. 

Summary of Contents for Cube C-01

Page 1: ...Maintenance operations www oxgard com info oxgard com Tel 7 812 366 15 94 Cube 01 turnstile...

Page 2: ......

Page 3: ...ctions 4 2 Conditions for performance of technical maintenance 5 3 Partial disassembly of the turnstile 5 4 Checking turnstile assemblies 11 5 Lubricating sliding parts of turnstile mechanisms 11 6 As...

Page 4: ...uld there be any failure MO should be performed immediately after repair works 1 3 During MO it is recommended to carry out the work by two qualified mechanical and electrical engineers acquainted wit...

Page 5: ...trongly forbidden to unfasten a cross board located under the indication panel Otherwise the manufacturer will terminate the validity of warranty for the product ATTENTION It is not recommended to adj...

Page 6: ...wo screws 1 and four screws 2 smoothly move the backshell up at a small distance so that not to break the cable coming to the indication board Fig 2 Disconnect the cable from the indication board Move...

Page 7: ...Maintenance operations 7 Fig 2 Move up...

Page 8: ...rther work to achieve this retract fixation lock 2 of the crossbars Fig 3 and while holding one crossbar in a fixed position rotate the other crossbar by the other hand clockwise so that all the cross...

Page 9: ...Maintenance operations 9 Fig 4...

Page 10: ...Cube 01 turnstile 10 Fig 5...

Page 11: ...urnstile mechanisms it is required to 1 Remove lower decorative board having undone two screws 1 Fig 6 2 Remove arms unit to get this 2 1 Unscrew fixation lock 2 with box spanner D22 2 2 Loose a screw...

Page 12: ...Cube 01 turnstile 12 Fig 6...

Page 13: ...Maintenance operations 13 Fig 7...

Page 14: ...r s manual and is available on the web site www oxgard com 6 2 In case of repair of damaged painted surfaces one should use powder paint identical to the damaged RAL9005 guiding the instructions for i...

Page 15: ...Maintenance operations 15...

Page 16: ...OOO Vozrozhdenie 66 Sofiyskaya str 192289 Saint Petersburg tel fax 7 812 336 15 94 www oxgard com info oxgard com...

Reviews: