Praktika T-02(K) turnstile
12
4.2. Installation of turnstile
CAUTION: When designing the mounting site of the turnstile take into
account that rotation direction of arms will be counter-clockwise during
"antipanic" mode.
4.2.1.
Prepare a horizontal surface at the installation site of
turnstile.
4.2.2.
Prepare cable conduits from the site to the installation
site of PU, RC, as well as, if required, to the point of ACS and FA
connection.
4.2.3. Follow the layout (Fig. 5) and drill 6 holes of 20mm
diameter in the floor anchors. Location of mounting holes according to
the outer dimensions of the turnstile is shown in Appendix 4. Depth of
the hole should exceed the length of the anchor for more than 5mm. Put
anchors into the holes.
4.2.4. Cable routing is carried out through a holes 1 or 2 (Fig. 5) in
the lower plate of turnstile.
Fig. 5 Linkage dimension