Installation instructions
3
PROTECTING THE FUTURE
Contents
4.1. Necessary equipment ........................................................................ 13
5.1. Connection of the control board. ...................................................... 28
5.2. Connection of the access control system (optionally) ..................... 29
5.3. Connection of the control board to the ACS controller. .................. 32
Appendix 1. Short summary of the data transmission bus CAN2.0 .......... 35
Appendix 2. Arrangement of the installation openings relative to the
external dimensions of the turnstile ........................................................... 36
Summary of Contents for Praktika T-10
Page 2: ...PROTECTING THE FUTURE...
Page 7: ...Installation instructions 7 PROTECTING THE FUTURE Fig 1 Initial position of the leaves...
Page 21: ...Installation instructions 21 PROTECTING THE FUTURE...
Page 26: ...Full height turnstile Oxgard Praktika 10 T 10H 26 PROTECTING THE FUTURE Fig 14 220 V 12 V...
Page 37: ...Installation instructions 37 PROTECTING THE FUTURE Fig 21 Sample for turnstile installation...
Page 39: ...Installation instructions 39 PROTECTING THE FUTURE...