Full-height turnstile Oxgard Praktika Т-10 (T-10H)
32
PROTECTING THE FUTURE
5.3. Connection of the control board to the ACS controller.
In some cases the turnstile CB is required to be connected directly to the
ACS controller, as passages to be enabled by the board (when unattended
by the controller) are perceived by the system as “break-in”.
In order to apply this diagram for connecting the turnstile it is
necessary to install the jumper J2 onto the cross-board (Fig. 16). If the
jumper J2 is installed, the turnstile is not responding to commands by the
board, but just transmits their status to the contacts of the terminal blocks
I/O1...I/O4 (Fig. 16) which are open-collector outputs. The contacts are
designed as per Table 6, with the board buttons numbered as shown on
Fig. 17. This group of contacts should have an output current of 150 mA at
most, with maximum allowable voltage 24 V.
Fig. 17.
Numeration of the control board buttons
Summary of Contents for Praktika T-10
Page 2: ...PROTECTING THE FUTURE...
Page 7: ...Installation instructions 7 PROTECTING THE FUTURE Fig 1 Initial position of the leaves...
Page 21: ...Installation instructions 21 PROTECTING THE FUTURE...
Page 26: ...Full height turnstile Oxgard Praktika 10 T 10H 26 PROTECTING THE FUTURE Fig 14 220 V 12 V...
Page 37: ...Installation instructions 37 PROTECTING THE FUTURE Fig 21 Sample for turnstile installation...
Page 39: ...Installation instructions 39 PROTECTING THE FUTURE...