Installation instructions
11
PROTECTING THE FUTURE
Fig. 5.
External appearance of the control board
3. Safety requirements
When operating the turnstile it is required to follow general safety rules for
operating electrical installations.
It is forbidden to:
- operate the turnstile in conditions not complying with the requirements to
operating conditions
- operate the turnstile under power supply voltage different from that
specified in Table 2.
When maintaining the turnstile:
All the works shall be done only with the turnstile de-energized.
When removing and installing large-sized and heavy parts of the turnstile
be doubly careful and prevent the parts from dropping.
Operating conditions:
The turnstile is resistant to environmental impact under U2 version as per
Summary of Contents for Praktika T-10
Page 2: ...PROTECTING THE FUTURE...
Page 7: ...Installation instructions 7 PROTECTING THE FUTURE Fig 1 Initial position of the leaves...
Page 21: ...Installation instructions 21 PROTECTING THE FUTURE...
Page 26: ...Full height turnstile Oxgard Praktika 10 T 10H 26 PROTECTING THE FUTURE Fig 14 220 V 12 V...
Page 37: ...Installation instructions 37 PROTECTING THE FUTURE Fig 21 Sample for turnstile installation...
Page 39: ...Installation instructions 39 PROTECTING THE FUTURE...