4.3. AUTOMATION SYSTEM TEST 

 

Once  the  installation  of  the  operator  has  been  completed,  make  a  careful  functional  check  of  all  accessories  and  safety 
devices connected. 

 

Give the Client the “User Guide” and demonstrate the correct operation and use of the gearmotor, highlighting the potentially 

 

dangerous zones of the automated system. 

 
 
 
 
 

5. MANUAL OPERATION 

 

If it is necessary to manually actuate the gate due to lack of power or 
automation interruption, it must be unlocked as follows. 

 

RELEASE LEVER 

 

1) Insert the key supplied in the plastic fold and 
open it.  
2)Pull the release lever. 

 

3)Open or close the gate manually. 

 
 
 
 
 
 
 
 

6. RESTORING NORMAL OPERATION 

 

To prevent an inadvertent boost from moving the gate during the manoeuvre, turn off the power supply before locking the 
motor again. 

 

RELEASE LEVER 

 

1) Close the release lever. 

 
2) Move the gate until the release system meshes. 

 
3) Close the plastic fold and restore the power supply to the system 
 
 
 
 
 
 

7. MAINTENANCE 

 

Check the functional operation of the system at least every six months, especially the efficiency of the safety 
devices (including the operator thrust force) and the release devices. 

 
 
 
 
 

 

7.1. 

OIL FILLING

 

 

Periodically check the amount of oil within the operator. 

 

For medium-low frequency of use, an annual check is enough, for more intensive use it is recommended every 
6 months. To refill, unscrew the cap and fill up to the indicated level. 

 
 
 

 

8. REPAIRS 

 

For any repairs, contact Norton’s authorised Repair 
Centres. 

Summary of Contents for TYPHON 2000

Page 1: ...TYPHON 2000 Manual for the installation and maintenance of automations for sliding gates ENGLISH...

Page 2: ...wer supply 12 The mains power supply of the automated system must be fitted with an all pole switch with contact opening distance of 3mm or greater Use of a 6A thermal breaker with all pole circuit br...

Page 3: ...y of 40 To ensure efficient operation it is necessary to operate in the work range below the curve Important The curve is obtained at a temperature of 20 C Exposure to the direct sun rays can reduce t...

Page 4: ...re that the pinion and rack engage correctly the foundation plate must be positioned as shown in Fig 03 right closing or Fig 04 left closing Warning The hole for the cables on the foundation plate mus...

Page 5: ...bottom of the slot 3 Mark the drilling point on the gate Drill a 6 5 mm hole and thread with an M8 male tap Screw the bolt 4 Move the gate manually checking if the rack is resting on the pinion and r...

Page 6: ...RESTORING NORMAL OPERATION To prevent an inadvertent boost from moving the gate during the manoeuvre turn off the power supply before locking the motor again RELEASE LEVER 1 Close the release lever 2...

Page 7: ...ated system is ideal for controlling vehicle access areas of medium transit frequency TYPHON 2000 system for sliding gates is an electro mechanical operator transmitting motion to the sliding gate wit...

Page 8: ...bled with other machinery to constitute machinery under the Directive 98 37 CEE and subsequent amendments 2 meets the essential safety requirements of the following Directives CEE 73 23 CEE and subseq...

Page 9: ...tronic box hinge 9 Support spring limit switch 1 0 Limit switch box base 1 1 Limit switch cover 1 2 Electric box base 1 3 Electric box cover 1 4 External cover 1 5 MSC lock 1 6 Fold TRANSMISSION AND U...

Reviews: