12
7.
INSTALLATION OF THE UNIT
7.1.
Selecting the mounting location
The Unit should be installed in a heated room such as bath, storage room, boiler room or an attic.
Make sure, that there is sufficient space to install not only the Unit itself, but also auxiliary ventilation
system components – noise silencers or air distribution boxes. Make sure that there is a possibility to
connect the condensate drain pipe of the Unit to the building's internal sewerage system.
Operating conditions:
+15
o
C - +30
o
C, relative air humidity <= 60%.
The Unit should be installed horizontally with maintenance and service hatch looking downwards. L-
shape fastening brackets (provided) should be used to fasten Unit to the ceiling. Use ceiling pins or
locking sleeves (not included), depending on installation surface. It is recommended to use vibro-
isolation gaskets (not included) to ensure that Unit vibration will not be transferred to the mounting
surface.
7.2.
Installation incline
IMPORTANT!
After Unit installation, make sure that the condensate drain corner is positioned lower
than remaining Unit corners (refer to Figure 2. Horizontal installation diagram"). This will ensure
smooth removal of accumulated condensate.
Corresponding distances must be maintained from ceiling plane, when installing the Unit:
No.
Distance from horizontal plane
1
20 mm
2
10 mm
3
0 mm
4
10 mm