15
Roll the valve up, and secure in place with the four velcro retainers. Make sure you properly roll the valves, do not bunch them up.
Close the Leading Edge air intake velcro.
Ensure the connected LSL and ISL lines pass between all
Bridles and the Speed Systems.
Open the Leading Edge air intake velcro to access the valve.
Reach inside the valve and undo the velcro retainers at the end of the valve sock on the left and right sides connecting to the ribs.
Pull the valve out.
14
15
10
11
12
13
16
The two valves on the left and right side of the center valve need
to be opened.
kite: 5-line oPen cell
to 4-line closed cell
1
2
Lay out the Kite and Speed Systems as you would for
set up.
Disconnect the LSL line from the two ISL lines.
Summary of Contents for Hyperlink V3
Page 1: ...1 Hyperlink V3 Manual ...
Page 24: ......