Attach the panel to the support rail.
Repeat the tile removal and strap attachment at the top of the panel.
Note that on all installations the excess strap above the panels should be removed for a neat and professional
appearance
H6. INLET / OUTLET CONNECTIONS TO COLLECTORS
Slide a 22 mm Compression Plug assembly to the top left and bottom right header tube projections of the
panel array. Tighten the assembly taking care not to twist the copper tubes of the collector. Make sure you use
correctly sized spanners and that the plug is held steady whilst the compression plug is tightened.
Inlet (cold water) Connections to Collector Array
Slide the DN 22 to DN 15 Compression Union Assembly onto the bottom left header tube projection of the col-
lector array. Tighten the assembly taking care not to twist the copper tubes of the collector.
Outlet (hot water) Connections to Collector Array
Assemble and install the Hot Connection Thermocouple Well assembly to the hot water outlet of the last panel
in the array as follows:
Hot Thermocouple Well Assembly with Air Bleed valve
a. Take the temperature well and slide it onto the copper spigot at the top right of the collector array with its
tee pointing upwards. Screw nipple into the tee and then another tee facing out with another nipple.
Screw the Reducing Brush into the top of the tee and then fit the air bleed valve into the top of the tee.
Tighten the assembly taking care not to twist the copper tubes of the collector. Make sure you use
correctly sized spanners and that the outlet assembly and blanking plugs are held steady whilst the
compression nut is tightened.
b. Apply thread tape or suitable sealant onto the 1/2” BSP thread of the Temperature Well.
c. Insert the Temperature Well into the 1/2” BSP socket at the end of the Hot Connection Union and tighten
normally. Take care not to over tighten.
The collector array is now completed and ready for connection to the water heater system
(FOR ILLUSTRATION PURPOSES ONLY)
16
17
Summary of Contents for OZS251E
Page 1: ......
Page 2: ......
Page 20: ... FOR ILLUSTRATION PURPOSE ONLY Cold Water Valve Train Connections to Storage Tank 18 ...
Page 35: ......
Page 36: ......