INSTRUCTIONS FOR INSTALLERS
Installation of Solar Hot Water Systems must be in accordance with:
1. AS/NZS 3500.4 - National Plumbing and Drainage Code
2. AS/NZS 3000 – Wiring Rules
3. Local plumbing regulations
INDEX
SECTION
PART
ITEM DESCRIPTION
PAGE
Section A
Safety Information – WARNINGS
3
Section B
Pre – inspection
4
Section C
System Sizing
4
C1
Solar Hot Water Systems
4
C2
Storage tanks
4
C3
Collectors
4
Section D
Types of Systems – Open Loop vs Closed Loop
5
Section E
Hot Water Usage Patterns
5
Section F
Tanks
5
F1
Tank Types
5
F2
Tank Sizes
5
F3
Tank Anodes
6
F4
Anode Replacement
6
F5
Tanks – How do they work
6
F6
Tank Position
6
F7
Heater Booster Element
7
Section G
Hot Water Storage Tank Connection
8
G1
System Connection Requirements
8
G2
Isolating , Non Return valves or Duo Valves
9
G3
Temperature – Pressure Relief ( TPR ) Valve
9
G4
Pressure Limiting Valve
9
G5
Expansion Control Valve ( ECV )
10
G6
Tempering Valve
10
G7
Drain Cock
11
G8
Line Strainer
11
G9
Connection to Electricity
11
G10
Insulation of Pipes
12
Section H
Installation
12
H1
Collectors – Installation Requirements
12
H2
Pipe Lengths and Bends
13
H3
Roof Area Required and Weights of Collectors
13
H4
Collector Size and Packaging
13
H5
Installation of the collectors
14
H6
Inlet / Outlet Connections to Collectors
17
H7
Storage Tank Installation
19
H8
System Controller / Pump installation
20
H9
Mount Pump Box Assembly
21
H10
System Piping Connections
22
H11
Temperature Sensor Fitment
22
H12
Preliminary System Test
22
H13
Commissioning System
23
Section I
System Maintenance / Periodic Inspections
25
I1
Valves and Fittings and Draining Tank
25
I2
Tank Anode replacement
26
I3
Replacement of the Electric Booster Element
26
I4
Replacement of Collector Glazing 26
I5
General Maintenance Tasks
26
I6
Contact Information
26
Warranty Information
28
2
3
Summary of Contents for OZS251E
Page 1: ......
Page 2: ......
Page 20: ... FOR ILLUSTRATION PURPOSE ONLY Cold Water Valve Train Connections to Storage Tank 18 ...
Page 35: ......
Page 36: ......