Lever for boom and bucket
Push the right lever forward to lower the boom.
Pull the lever back to raise the boom.
Move the lever to the left to tilt the bucket in
and move the lever to the right to tilt the bucket
out.
The two hydraulic levers provide four functions at the same time. It requires practice
and experience to operate them efficiently, avoiding too many extra movements.
The swingarm boom must be locked
when transporting the equipment.
Position the boom all the way back
and set the pin through the holes in
the swing arm and boom.
When the pin is not in use, store it in
the hole on the swing arm and
boom.