15
MAN 9066017 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: +45 70212626
6600 Vejen, Denmark
E-mail: salg@p-lindberg.dk
Step 4
Mount the control handles: place the handle on the rod, and fix it tight in right
direction.
Step 5
Mount the chute: place the chute
on the chute seat, fix it with three
bolts and nuts.