28
MAN 9058167 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: +45 70 21 26 26
DK-6600 Vejen
e-mail: salg@p-lindberg.dk
Storage
Storing for short periods (up to two days)
1.
Carry out the procedure for pressure relief.
2.
Leave the suction and return hoses in the paint
bucket.
3.
Seal the paint and bucket thoroughly with an
airtight plastic cover.
4.
Engage the locking pin.