background image

24

HOIST ASSEMBLY

1.  Assemble Brake, Cable Drum, Freefall, and Planet 

Carrier subassemblies following procedures in the 
subassembly section of this manual.

2.  Press ball bearing (9) into fi nal drive support end plate 

(3) and install the retaining ring (8).  Turn the support 
end plate with drum end up for seal installation.   Ap-
ply Loctite Aviation Gasket Sealant (or equivalent non-
hardening sealant) to the outside diameter of the drum 
seal (10) and install the seal in the support end plate 
(3) with the spring side toward the bearing.

3.  Set freefall assembly on the fl oor with bearing support 

end down and ensure it is level and stable – it will re-
main in this position during winch assembly.   Note the 
position of the vent and oil level sight glass to ensure 
proper position when the support end plate is installed 
in later steps.

4.  Apply general purpose grease to thrust washer (26) 

and install on outside diameter of the bearing support.  
Grease the thrust button (27) and install in the recess 
in the bearing support.

5.  Install the output planet carrier assembly (400) into the 

ring gear (4) of the freefall assembly.   

6.  Ensure o-ring (29) is installed on the freefall assembly 

and apply a light coat of grease to the o-ring surface.  
Use ½ -13 eyebolts in the tapped holes for the tie 
plates to lift the support end plate and lower it onto the 
freefall assembly.  Install the capscrews (35) and lock-
washers (16) that fasten the freefall assembly to the 
bearing support and tighten.  

Note:

  The capscrews 

should be torqued after the hoist is assembled and on 
its mounting feet.

7.  Ensure bearing (504) and oil seal (505) are installed 

in the primary drive end of the drum.   Apply grease 
to the inner race of the support end plate bearing (9) 
and seal (10).  Use lifting straps to lower the drum 
assembly (500) onto the support end plate aligning 
the splines of the drum with the output planet carrier 
splines.  Install the sun gear shaft (5) into the output 
planet carrier assembly.

8.  If the primary end plate (1) was removed from the pri-

mary housing (2), assemble by applying Loctite 242 to 
capscrews (14) and torque to 110 lb-ft (149 N-m).

9.  Apply grease to the inner race of the drum bearing 

(504) and seal (505).   Use ½ -13 eyebolts in the 
tapped holes of the primary housing and lower it onto 
the drum.

10.  Install the tie-plates using the shoulder capscrews (23) 

and lockwashers (16) and torque to 110 Lb-ft (149 
N-m).  

NOTE:

  The shoulder of the tie plate capscrew extends 

8mm into the end bracket mounting holes to serve as 
dowel pins to hold the end brackets aligned.  Do not 
replace the special capscrews with common standard 
thread capscrews.  See photograph below.

11.  Install bearing (12) in the primary housing and apply a 

light coat of grease to the inner race.  Install the bear-
ing using a correctly sized bearing driver as shown in 
the photograph below.  Install the primary ring gear 
(6) into the primary housing (2) with the counter-bore 
along the ring gear teeth facing the motor side and the 
cast groove facing the drum.

12. Install the primary planet carrier subassembly (300) 

into the ring gear.  Install the primary sun gear (7), and 
thrust washer (48). NOTE: GH30B built prior to hoist 
serial number 0801914 do not have thrust washer 
(48.)

Summary of Contents for Gearmatic GH30B

Page 1: ...918 251 8511 FAX 918 259 1575 www paccarwinch com LIT2363_R6_2 2012 Printed in U S A PACCAR Inc All Rights Reserved GH30B with FreeFall Attachment Liebherr Units Only SERVICE AND MAINTENANCE MANUAL RE...

Page 2: ...t which are not included in this manual Whenever a question arises regarding your Gearmatic hoist or this manual please contact Gearmatic Product Sup port Department for the latest available informati...

Page 3: ...ball bearings The internal ring gear is kept from rotating by a multi disc brake The brake is applied by springs that force the piston against the pressure plate which prevents the ring gear from rot...

Page 4: ...from contami nation at all times 16 Use correct anchor for wire rope and pocket in drum 17 Do not use knots to secure or attach wire rope 18 The Gearmatic designed wire rope anchors are not intended t...

Page 5: ...a 5 Make certain that the hoist drum is centered behind the first sheave and the fleet angle does not exceed 1 degrees The hoist should also be mounted perpendicular to an imaginary line from the cent...

Page 6: ...e wire rope and insert it through the small opening on the cable drum flange Loop the wire rope and push the free end about 3 4 of the way back through the pocket Install the wedge as shown below then...

Page 7: ...until it reach es the load Securely fasten the hoist wire rope to the load and be sure all ground personnel are a safe distance from the load Slowly lift the load a short distance and stop A small amo...

Page 8: ...250 hours of operation The regular gear oil change inter vals may be adopted after the first oil change 5 Inspect the wire rope rigging and all sheaves accord ing to the wire rope and rigging manufac...

Page 9: ...point To change the gear oil remove the drain plugs shown on the drawings below from each end of the hoist and the drum and collect a sample from each housing for oil analy sis Removing the vent plug...

Page 10: ...SHORE CRANES SUSTAINED FAST DUTY CYCLES OR FREQUENT LIFTING i Texaco Shell Meropa 150 Meropa 220 Omala 150 Omala 220 Chevron Gear Compounds EP 150 Gear Compounds EP 220 Texaco Mobil Shell Meropa 150 M...

Page 11: ...100 to 400 ppm Normal 400 to 700 ppm Caution Abnormal Sample monitor more frequently tear down inspection may be required 701 ppm up Unacceptable Abnormal Sample tear down inspection required In all c...

Page 12: ...nd Tag and remove the hoses that connect the motor assembly to the brake release port on the hoist 3 Remove the four capscrews and lockwashers secur ing the motor and lift the motor off the hoist Remo...

Page 13: ...tie plate capscrews and lock washers and remove the tie plates 21 Remove the sun gear shaft 5 Remove the primary housing 1 using eye bolts and lifting straight up off of the drum 9 Use lifting clamps...

Page 14: ...ll assembly from the support end plate 3 See Warning on page 15 806 806 3 16 35 802 12 Remove the thrust button 27 and the output planet carrier assembly 400 from the end plate Refer to subassembly se...

Page 15: ...ree fall ring gear 4 Remove o ring 29 and discard 38 4 29 802 806 801 804 805 803 801 DISASSEMBLY Remove retaining ring 38 from the center ring gear bearing support BEFORE removing capscrews 806 If ca...

Page 16: ...a flat surface and check for distortion with a straight edge Friction material should appear even across the entire surface with the groove pattern visible Replace friction discs or divider plates if...

Page 17: ...801 Tap with a soft mallet to drive the piston into the housing Install the springs 804 onto the pins in the brake piston 5 Install o ring 808 in the bearing support and coat lightly with grease Set...

Page 18: ...and back up rings from the brake piston and discard items 203 204 205 and 206 Clean and Inspect 1 Thoroughly clean and inspect all parts Check seal ing surfaces on the primary housing cover and brake...

Page 19: ...brake subassembly Place the brake housing cover 201 on a clean work surface with the motor side up and space it at least 2 inches 50 mm off the table with wood or metal blocks This gives clearance for...

Page 20: ...lant or equivalent to the outside diameter of the seal 505 and install the seal in the motor end drum flange 503 with the spring side of the seal toward the drum barrel 3 Install o ring 506 on the mot...

Page 21: ...The cage should be inspected for unusual wear or deformation particularly the cage bars If there is damage that will impair the cage s ability to separate retain and guide the rollers properly the bea...

Page 22: ...sher 2 Carefully align the pin hole in the carrier with the hole in the shaft and drive a new roll pin into place AL WAYS use NEW roll pins 3 The roll pin is slightly recessed into the carrier when pr...

Page 23: ...of the Primary Planet Carrier as sembly procedure to install and stake a NEW roll pin in the carrier Repeat this procedure for each of the planet gears 404 405 402 406 405 404 403 407 401 OUTPUT PLANE...

Page 24: ...torqued after the hoist is assembled and on its mounting feet 7 Ensure bearing 504 and oil seal 505 are installed in the primary drive end of the drum Apply grease to the inner race of the support end...

Page 25: ...201 to lower the assembly into the primary housing Install capscrews 17 and lock washers 16 that fasten the housing cover to the pri mary housing Tighten capscrews in a cross pattern one turn each tim...

Page 26: ...26...

Page 27: ...REW 12 16 LOCKWASHER 34 205 O RING 1 801 HOUSING FREEFALL 1 17 CAPSCREW 6 206 BACK UP RING 1 802 BEARING SUPPORT 1 18 PLUG 4 207 SPRING 12 803 PISTON 1 19 O RING 1 208 SPRING SEPARATOR 1 804 DIE SPRIN...

Page 28: ...0 25 4 1 0 25 4 13 0 330 2 3 4 10 NUT 20x2 5 mm 75 10 ALL THREAD ROD 20X2 5 mm FILLET WELD FILLET WELD FILLET WELD THREADED ROD TAP AND WELD TO BOTTOM BAR 75X3 BAR STOCK 20X75 mm 75X3 BAR STOCK 20X75...

Page 29: ...29...

Page 30: ...s Hg 60 o F pounds sq in PSI X 6 895 kilopascals kPa kilopascals kPa X 0 145 pounds sq in PSI pounds sq in PSI X 0 0703 kilograms sq cm kg cm 2 kilograms sq cm kg cm2 X 14 22 pounds sq in PSI pounds s...

Reviews: