31
Figure 15. Power Off
Figure 16. Chart Holder
SYSTEM
Set up the PRC 2000 system using Figures 15 through 18 and the following steps.
1. Store the shipping container(s) in a convenient location. Reuse of these containers will prevent
damage if you ship or store the system.
2. Place
POWER
Switch in the “OFF” or “0” position.
3. Position the system on a convenient bench.
4. Insert the power cord into AC Power Receptacle at the rear
panel
of the system.
CAUTION
To insure operator safety, the AC supply receptacle must be checked for
proper grounding before initial operation.
5. Assemble and attach Tip & Tool Stands & Hot Cubbies to the
power source. Assembly instructions are enclosed with each
Tip & Tool Stand and Hot Cubby.
6. Using Figure 16 as a guide, install the Tip & Temperature
Selection System Chart Holder to the top of the power source.
7. Install the Tip & Temperature Selection System Chart booklet
onto the Chart Holder.
8. Place handpiece(s) into the Tip & Tool Stands and Hot Cubbies.
Summary of Contents for PRC 2000
Page 1: ...1 SYSTEM OPERATION MAINTENANCE MANUAL PRC 2000 SYSTEMS ...
Page 2: ...2 ...
Page 3: ...3 MANUAL NO 5050 0313 REV G ...
Page 17: ...17 Figure 6 Thermal Management Center ...
Page 23: ...23 Figure 12 Pik And Paste Section ...
Page 74: ...74 ...
Page 95: ...95 Figure 122 Pulse Plate Set Up ...
Page 96: ...96 ...
Page 102: ...102 ...
Page 111: ...111 ...
Page 119: ...119 ...