33
HANDPIECE VACUUM/PRESSURE
The SX-65A, SX-70 and TP-65 handpieces require the use of the
SNAP-VAC
(vacuum) Port and the TJ-70
handpiece requires the use of the Controllable
PRESSURE
Port on the
THERMAL MANAGEMENT
CENTER
(
TMC
).
There are two preferred methods for connection of the Air Hose. The advantages of each method are
discussed in the paragraph below. Select the method best suited to your particular application.
1. TRADITIONAL METHOD - Best suited for single air handpiece configurations. Configuration
allows the air hose to be attached to the handpiece power cord. Any TJ-70 Mini ThermoJet
handpiece should be configured using this method.
2.
QUICK CONNECT METHOD
-
Best suited for
THERMAL MANAGEMENT CENTER
configurations which include multiple air handpiece attachment. A single Air Hose can be
easily transferred between handpieces using quick connect fittings attached to the rear of each
handpiece.
PROCEDURES:
TRADITIONAL METHOD
1. Connect the 54 inch (137cm) length of Air Hose to the
metal tube in the back of the air handpiece.
2. Insert the ridged end of a male quick connect hose
mount Fitting (P/N 1259-0087) into the free end of the
54 inch (137cm) Air Hose.
3. Secure the Air Hose to the handpiece power cord with
cable clips (P/N 1321-0085-01).
Fitting
Air Hose
Figure 19. Air Hose To Fitting
Summary of Contents for PRC 2000
Page 1: ...1 SYSTEM OPERATION MAINTENANCE MANUAL PRC 2000 SYSTEMS ...
Page 2: ...2 ...
Page 3: ...3 MANUAL NO 5050 0313 REV G ...
Page 17: ...17 Figure 6 Thermal Management Center ...
Page 23: ...23 Figure 12 Pik And Paste Section ...
Page 74: ...74 ...
Page 95: ...95 Figure 122 Pulse Plate Set Up ...
Page 96: ...96 ...
Page 102: ...102 ...
Page 111: ...111 ...
Page 119: ...119 ...