4. Holding the barrel as shown (at a 45°
angle to the work), rest the tip on a
piece of paper and dispense a small
amount of material. This initial
dispensing will fill the tip with
material.
5. Wipe any material residue from the
end of tip.
6. Hold the barrel as shown over the
work area.
7. Depress the foot pedal to dispense
material. The dispense cycle will
remain on in the
CONT
Mode until
the foot pedal is released. In the
TIMED
Mode, the cycle will continue
for the period of time selected on the
PASTE DISP
Timer Control. The
pump will turn on periodically to
maintain reservoir air pressure. The
PASTE DISP
LED will illuminate
throughout the dispense cycle and
while the paste pump is running.
8. Place barrel in Dispenser Cubby when dispensing operation is complete.
NOTE
Condensation may occur in the air hose after extended use. This is a
normal occurrence.
Figure 107. Paste Dispensing
Summary of Contents for PRC 2000
Page 1: ...1 SYSTEM OPERATION MAINTENANCE MANUAL PRC 2000 SYSTEMS ...
Page 2: ...2 ...
Page 3: ...3 MANUAL NO 5050 0313 REV G ...
Page 17: ...17 Figure 6 Thermal Management Center ...
Page 23: ...23 Figure 12 Pik And Paste Section ...
Page 74: ...74 ...
Page 95: ...95 Figure 122 Pulse Plate Set Up ...
Page 96: ...96 ...
Page 102: ...102 ...
Page 111: ...111 ...
Page 119: ...119 ...