5
BASE KIT INSTALLATION
Crate removal
1) Carefully remove crate top, side supports and plastic
cover bag.
2) Leave the unit on the pallet.
Leg Kit (Classic Gas model only)
1) Remove the 1/2" nuts and washers from the studs on the
bottom corners of the stove using a 3/4" wrench. Save nuts and
washers for later use.
2)
Remove the lag bolts that secure the unit hold down
brackets to the pallet.
2)
Remove the hold down brackets and discard.
3)
Position the legs onto the studs.
4)
Place 1/2" washer over the studs and secure in place
with 1/2" nut previously removed.
4)
Remove the unit from the pallet and install.
Pedestal Kit (Super 27 Gas model only)
1)
Remove the ash lip assembly and pedestal from the
shipping box.
2)
Align ash lip assembly mounting screws into slots of the
pedestal door and secure in place.
3)
Using a 3/4" wrench, remove the 1/2" nuts and washers
from the studs on the bottom corners of the stove. Save
nuts and washers for later use.
4)
Lift the unit off the hold down brackets and carefully
place unit on its back, taking care to not damage the
restrictor positioning panel located on the back of the
unit.
5)
Align the pedestal mounting holes with the studs on the
stove.
6)
Secure the pedestal to the stove with the 1/2" nuts and
washers previously removed.
7)
Carefully place the unit in an upright position.
Leg Adapter (Super 27 Gas model only)
1)
Remove the ash lip and adapter from the shipping box.
2)
Align the ash lip mounting slots with the studs on the front
control access door. Secure in place with 1/4" nuts.
3)
Using a 3/4" wrench, remove the 1/2" nuts and washers
from the studs on the bottom corners of the stove. Save
nuts and washers for later use.
4)
Lift the unit off the hold down brackets and carefully
place unit on its back, taking care to not damage the
restrictor positioning panel located on the back of the
unit.
5)
With the control access door facing up, align the adapter
mounting holes with the studs on the stove bottom.
6)
Position the legs on to the studs.
7)
Place 1/2" washer over the studs and secure legs in
place with 1/2" nut previously removed.
8)
Carefully place the unit in an upright position.
DOOR KIT INSTALLATION
1)
Remove door from packing box and inspect.
2)
Position door onto hinge pins located on the right side
of the firebox opening.
3)
Latch door closed by lifting safety catch and rotating
door handle counter-clockwise till latched.
Fig. # 3