background image

14

FUSION_D1

010604-16

Replacement Parts

(WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION)

ITEM

DESCRIPTION

PART NO.

ITEM DESCRIPTION

PART NO.

1a .......... Side Shield, Left, Mocha ................... FSND.46025MCA

.............. Side Shield, Left, Brushed Nickel ..... FSND.46025BNA

1b .......... Side Shield, Right, Mocha ................... FSND.4602MCA

.............. Side Shield, Right, Brushed Nickel ..... FSND.4602BNA

2 ............ Top Air Deflector, Mocha ................... FSND.4603MCA

.............. Top Air Deflector, Brushed Nickel ..... FSND.4603BNA

3 ............ Door Catch ................................................. WODC.1461
4 ............ Glass Clamps  (4 pc.) .................................... DRFS.4633
5 ............ Glass Bar Set  (2 pc.) ................................ WODC.41405
6 ............ Replacement Glass  (c/w Tape) ............. DR31.WGLKIT
7 ............ Door Gasket Kit .................................... DR31.WDGKIT
8 ............ Door Frame .......................................... DRFS.4610WLD
9 ............ Door Frame Overlay, Mocha ............... DRFS.4611MCA

.............. Door Frame Overlay, Brushed Nickel .. DRFS.4611BNA

10 .......... Door Handle Assembly ................................ DRFS.4635
11 .......... Boost Manifold ........................................................ 4105

All parts may be ordered from your nearest Pacific Energy dealer.
Contact Pacific Energy for the location of the dealer nearest you.

12a ........ Firebrick - 1 1/2" x 4 1/2" x 1 1/4"  (1 pc.) ............... 248
12b ........ Firebrick - 3" x 4 1/2" x 1 1/4"  (1 pc.) ..................... 247
12c ........ Firebrick - 4" x 4 1/2" x 1 1/4"  (1 pc.) ..................... 246
12d ........ Firebrick - 7 1/4" x 4 1/2" x 1 1/4"  (1 pc.) ............... 245
12e ........ Firebrick - 9" x 4 1/2" x 1 1/4"  (17 pc.) ............ 5096.99

.............. Firebrick Set ............................................. BRIC.SSERA

13a ........ Brick Rail, Left (Latch Side) .................. SSER.4122001
13b ........ Brick Rail, Right (Hinge Side) ............... SSER.4122101

.............. Replacement Baffle Kit ......................... SSER.DBAKIT

14a ........ Baffle (not sold separately) ......................... SSER.DBAF
14b ........ Side Insulation (not sold separately) ............ 5068.732.B
15 .......... Baffle Pin ................................................................... 125
16 .......... Baffle Gasket .......................................................... 139.5
17 .......... Flame Shield  (c/w Bolt and Nut) ................. SSER.4115
18 .......... Air Shutter Assembly ................................... FSND.4631
19 .......... Baffle Air Control Assembly .......................... SSER.214
20 .......... Ash Dump Assembly .................................. WODC.2261
21 .......... Ash Box ........................................................ FSND.4615

1b

21

11

1a

2

10

7

8

6

5

18

4

19

17

3

9

13a

13b

14b

14a

12b

12d

12a

12c

12e

14b

15

16

20

Summary of Contents for Fusion

Page 1: ...TION OPERATION GUIDE Design D Model FUSION PLEASE SAVE THESE INSTRUCTIONS SAFETY NOTICE Ifthisstoveisnotproperlyinstalled a house fire may result For your safety follow the installation instructions C...

Page 2: ...on 8 Clearances 8 Chimney and Connector 8 Double Wall Connector 8 Single Wall Connector 8 Procedure 8 Floor Protector 9 Combustion Air 9 Operation 10 Wood Selection 10 How to Test Your Wood 10 Lightin...

Page 3: ...nwoodandtoo slow a burning rate This heavy deposit is building up at least as quickly in the chimney WARNING ONLY USE MATERIALS SUPPLIED BY MANUFACTURER WHEN DOING MAINTE NANCE OR REPLACEMENTS 4 DOOR...

Page 4: ...ust be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample com bustion air will help to minimize the buildup Chimney Fires The result of excessive creosot...

Page 5: ...9 8 1 4 8 1 4 4 1 4 4 1 4 18 22 11 1 4 11 1 4 25 22 1 4 36 1 4 23 1 2 26 3 4 8 3 8 33 1 2 Minimum Clearance to Combustibles FIG 1 Double Wall Connector Residential Single Wall Connector Residential Al...

Page 6: ...instructions 7 Attach stove to flooring using two 1 4 x 2 or longer lag screws Warning Under no circumstances is this heater to be installed inamakeshiftor temporary manner Itmaybefiredonlyafter the...

Page 7: ...el DBSP 3 Energy Vent 7 Industrial Chimney Model Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6...

Page 8: ...meetalllocalcodes Donotconnectthisunittoachimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Use a listed double wall co...

Page 9: ...ct Outside air may also be ducted from outside through the 4 diameter knockout hole in the rear of the pedestal enclosure Note Thisunitisnotdesignedtobeoperatedwiththefiring door open In addition to t...

Page 10: ...very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting a Fire WARNING Never use chem...

Page 11: ...ler Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Extended or Overnight Burns 1 Open door and rake hot embers towar...

Page 12: ...firebox 8 Install the two screws through the flange of the blower into the rear shield 9 Plugthepowersupplycordinandcheckbloweroperation Power Cord Clearance Tab Temperature Switch Blower Operation Pr...

Page 13: ...dup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t Burn Overnight 1 Air control i...

Page 14: ...ost Manifold 4105 All parts may be ordered from your nearest Pacific Energy dealer Contact Pacific Energy for the location of the dealer nearest you 12a Firebrick 1 1 2 x 4 1 2 x 1 1 4 1 pc 248 12b Fi...

Page 15: ...ACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LISTED CONNECTORS SECURITY MODELS DP O...

Page 16: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan BC V9L 4T8 Phone 250 748 1184 Web site http www pacificenergy net...

Reviews: