background image

2

1

19

20

22

21

1

3

a

15

15

a

15

b

16

14

4

3

18

24

5

6

14

13

7

12

a

8

9

13

12

b

11

d

11

c

11

a

10

11

b

23

17

12 

VISTA and CLASSIC-C 

111206-16

REPLACEMENT PARTS - PACIFIC VISTA

FIGURE #4a

(WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION)

ITEM 

DESCRIPTION 

PART NO. 

ITEM 

DESCRIPTION 

PART NO.

1

 ......... SIDE SHIELD, LEFT OR RIGHT ............. VIST.

2201

2

 ......... TOP DEFLECTOR ................................... VIST.

2203

3

 ......... ASH LIP (c

/

w trim & hardware) ....... ALIP.

221001

MB

............ ASH LIP TRIM, GOLD .................................

2210

.

01

............ ASH LIP TRIM, NICKEL .................................

2210

.

6

............ ASH LIP HARDWARE ..............................ALIP.

3211

3

a ....... DOOR CATCH ..................................... WODC.

1461

4

 ......... GLASS CLAMP SET (

4

 pc.) .................... SSER.

142

5

 ......... GLASS BAR SET (

2

 pc.) ......................... VIST.

2125

6

 ......... REPLACEMENT GLASS (c

/

w Tape) ..... DRVS.

2082

7

 ......... DOOR GASKET KIT ......................................

2082

.

2

8

 ......... DOOR CASTING, ARCH, BLACK ........ CAST.VSST

............ DOOR CASTING, ARCH, GOLD ......... CAST.VSGD
............ DOOR CASTING, ARCH, NICKEL ........ CAST.VSNI

9

 ......... DOOR HANDLE ASSEMBLY ............... WODC.

4147

10

 ....... BOOST MANIFOLD ..........................................

2105

11

a ...... FIREBRICK, 

1

 

1/2"

 x 

4

 

1/2"

 x 

1

 

1/4"

 ...................

248

11

b ...... FIREBRICK, 

3"

 x 

4

 

1/2"

 x 

1

 

1/4"

 .........................

247

11

c ...... FIREBRICK, 

4"

 x 

4

 

1/2"

 x 

1

 

1/4"

 .........................

246

11

d ...... FIREBRICK, 

9"

 x 

4

 

1/2"

 x 

1

 

1/4"

 ..................

5096

.

99

............ FIREBRICK, SET .................................. BRIC.VISTA

12

a ..... BRICK RAIL, LEFT ...........................................

2122

12

b ..... BRICK RAIL, RIGHT ......................................

2122

.

5

13

 ....... RAIL EXTENSIONS (

2

 pc. required) ................

2123

14

 ....... BAFFLE INSULATION KIT (

3

 pc.) ...............

5068

.

74

15

 ....... BAFFLE ....................................................VIST.

2111

15

a ..... BAFFLE GASKET ............................................

139

.

5

15

b ..... BAFFLE PIN .......................................................

125

16

 ....... FLAME SHIELD  (c

/

w nut & bolt) ..............VIST.

2115

17

 ....... AIR SHUTTER ASSEMBLY ..................... VIST.

4531

18

 ....... PEDESTAL FRONT COVER 

............ ASSEMBLY ............................................ SSER.

2075

19

 ....... PEDESTAL..................................... VIST.

2205

WELD

20

 ....... ASH DRAWER ENCLOSURE ................. VIST.

2219

21

 ....... LEG, BLACK ....................................... CAST.LEGST

............ LEG, GOLD...................................... CAST.LEGGLD
............ LEG, NICKEL ....................................... CAST.LEGNI

22

 ....... ASH BOX (leg model) .............................. VIST.

2220

23

 ....... ASH DUMP ASSEMBLY ........................ WODC.

226

24

 ....... ASH BOX (pedestal model) ..................... VIST.

2209

FIG. #4a

All parts may be ordered from your nearest Pacifi c Energy dealer.  Contact Pacifi c Energy for the location of 
the dealer nearest you.

Summary of Contents for Paci?c VISTA

Page 1: ...C SAFETY NOTICE If this stove is not properly installed a house fire may result For your safety follow the installation directions Contact local building or fire officials about restrictions and inst...

Page 2: ...Y AND MAINTENANCE 3 ASSEMBLY 4 MOBILE HOME INSTALLATION 6 RESIDENTIAL INSTALLATION 7 FLOOR PROTECTOR 7 COMBUSTION AIR 8 WOOD SELECTION 8 OPERATING 8 PROPER DRAFT 9 ASH REMOVAL 9 BAFFLE REMOVAL 9 OPTIO...

Page 3: ...onnect the detectors If necessary relocate them to reduce their sensitivity SAFETY NOTICE IF THIS STOVE IS NOT PROPERLY INSTALLED A HOUSE FIRE MAY RE SULT FOR YOUR SAFETY FOLLOW THE INSTALLATION DIREC...

Page 4: ...stal mounting holes with the studs on stove bottom 2 Secure in place with 1 2 nuts previously removed 3 Carefully place the unit in an upright position LEG KIT 1 With the unit on its back and removabl...

Page 5: ...Chimney Roof ashing Storm collar Hooded vent Attachment to oor for mobile homes Spark arrestor rain cap FIG 2 7 2 1 m Minimum Ceiling Height 58 1473 mm Minimum 48 1219 mm Minimum The chimney may incor...

Page 6: ...upplier for installation advice PROCEDURE Note See Combustion Air section on page 9 1 Position stove and oor protection with the clearances as stated on the label or as in Figure 1a and 1b page 4 5 2...

Page 7: ...ntingdown This will carry any liquid creosote or condensation back into the stove Thechimneyconnectorshouldnotpassthroughatticorroof space closet or similar concealed space or oor ceiling wall or part...

Page 8: ...nder no circumstances should you attempt to barbecue in this heater HOW TO TEST YOUR WOOD Add a large piece of wood to the stove when it has a good large bed of coals It is dry if it is burning on mor...

Page 9: ...e room through appliance and chimney connector joints indicates inadequate draft ASH REMOVAL When ever ashes get 3 to 4 inches deep in your rebox and when rehasburneddownandcooled removeexcessashes Le...

Page 10: ...t leakage Replace gasket Check latch EXCESSIVE CREOSOTE BUILDUP See 1 2 3 above LOW HEAT OUTPUT 1 Wood is wet Use dry wood 2 Fire too small Build a larger re 3 Draft too low Chimney plugged or restric...

Page 11: ...open When wood is burned slowly it produces tar and other or ganic vapours which combine with expelled moisture to form creosote The creosote vapours condense in the relatively cool chimney ue of a s...

Page 12: ...ST VSNI 9 DOOR HANDLE ASSEMBLY WODC 4147 10 BOOST MANIFOLD 2105 11a FIREBRICK 1 1 2 x 4 1 2 x 1 1 4 248 11b FIREBRICK 3 x 4 1 2 x 1 1 4 247 11c FIREBRICK 4 x 4 1 2 x 1 1 4 246 11d FIREBRICK 9 x 4 1 2...

Page 13: ...x 4 1 2 x 1 1 4 248 11b FIREBRICK 3 x 4 1 2 x 1 1 4 247 11c FIREBRICK 4 x 4 1 2 x 1 1 4 246 11d FIREBRICK 9 x 4 1 2 x 1 1 4 5096 99 FIREBRICK SET BRIC VISTA 12a BRICK RAIL LEFT 2122 12b BRICK RAIL RI...

Page 14: ...the heater in the upright position install rebricks as follows First install 4 full size rebricks against the rear wall Next install the side rebricks 2 full size each side Lastly place 4 full size on...

Page 15: ...MODEL HT 3000 SELKIRK SENTINEL MODEL CF INDUSTRIAL CHIMNEY MODEL EXCEL 2100 ENERGY VENT COMMANDER 5000 IN USA SECURITY MODEL ASHT OR S2100 OLIVER MACLEOD MODEL 3103 OR HT 3000 SELKIRK METALBESTOS MODE...

Page 16: ...16 VISTA and CLASSIC C 111206 16 Printed in Canada PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan BC V9L 6V8 Phone 888 715 2398 Web site www paci cenergy net...

Reviews: