background image

14

 

SUMMIT-B   091013-20

OPERATING TIPS

1. Always use dry, seasoned fi rewood, up to 18" long.  
Load wood endwise, a mixture of large and small 
pieces, on top of a good ash base (1" minimum).

2.  Operate on a medium to high setting, for up to 
1 hour from cold start.  After the initial warm up pe-
riod, refuel and leave the air control on a medium 
setting for 5 to 10 minutes more and then set the 
air control to the desired position.

3.  If a slow burn is desired, set the air control to 
low.  Active secondary burning should be present 
above the wood load.  If it is not present or goes 
out shortly after, proper operating temperature has 
not been reached and the stove needs additional 
warm up time.

Understanding & Operating Your Pacifi c Energy Stove

The Pacifi c Energy line of woodstoves is a culmina-
tion of years of research and development.  Designed 
to be efficient, clean-burning and user-friendly, this 
heater will give you years of warm service.  However, 
a knowledgeable operator is still the most important 
factor for maximum performance and part of this is 
understanding the basic functions of this design.

Traditional wood stoves had a basic combustion 
system which allowed a considerable amount of 
heat energy to escape up the chimney as unburned 
gases and particulates (smoke).  Pacifi c Energy 
has designed a system that solves the problem 
by burning the smoke and releasing the additional 
heat to the room.

This system has two critical design features:

1. 

Above fi re secondary air injection:

The hollow "air baffle" injects super-heated sec-
ondary air just above the load. With the stove at 
the proper operating temperature, this will create 
a secondary fl ame that will be evident for approxi-
mately 1/3 of the total burn time.

2. 

High mass and thermal insulation:

The high mass (weight) acts as a heat storage and 
the thermal insulation keeps the combustion zone 
hot.  Active fl aming takes place during the fi rst part 
of the burn.  During this stage, heat is stored in the 
mass of the unit and is later released slowly and 
evenly.  As wood chars, active fl aming will dimin-
ish.  This clean charcoal burning stage will last for 
a considerable length of time and refuelling should 
be avoided until the charcoal base has become 
quite small.

1

2

3

5

6

4

1 -Boost Air 

4 -Secondary Combustion Zone

2 -Main Combustion Air 

5 -Radiant Heat

3 -Air Wash System 

6 -Convected Heat

Summary of Contents for SUMMIT

Page 1: ...uctions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental Protecti...

Page 2: ...2 Baffle Removal 12 Removal 12 Secondary Air Box Removal and Cleaning 12 Optional Blower 13 Blower Operation 13 Optional Outside Air Adaptor 13 Appendix A 13 Troubleshooting 13 Understanding Operating...

Page 3: ...DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOOR GLASS Do not slam loading door or otherwise impact glass When closing door make sure that no logs protrude to impact the glas...

Page 4: ...he Chimney System Top baffle board blanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vac...

Page 5: ...lution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote buildup is a chimney fire Chimney fires are dangerous Chim...

Page 6: ...sing a 3 4 wrench remove 1 x 1 2 bolts and save for later use 5 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up align the...

Page 7: ...7 Attach stove to flooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be f...

Page 8: ...mmander 5000 Ceiling support XSF FCS SF CF CSP CH6LCS Rafter radiation shield RRS 3 Chimney length XL3 SL3 L3 CF 36SL CH636 2 Chimney length XL2 SL2 L2 CF 24 CH624 Roof flashing XFA RF17 FA CF FRA CH6...

Page 9: ...tion within 10 feet 3 m The installation must meet all local codes Do not connect this unit to a chimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of app...

Page 10: ...be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adaptor may be required see Optional Blower section Cut or drill a 4 hole th...

Page 11: ...Place crumpled newspaper in the centre of the heater and criss cross with several pieces of dry kindling Add a few small pieces of dry wood on top 3 Ignite the paper and close the door 4 After the fir...

Page 12: ...ct air inlet setting is affected by variables such as type of wood outside temperature chimney size and weather conditions With practice you will become proficient in operating your heater and will ob...

Page 13: ...d with the kit Route power supply cord away from heater Electrical rating 115 volts A C 84 amps Fan output rating 125 CFM Blower Operation To ensure peak performance from your stove allow the applianc...

Page 14: ...this design Traditional wood stoves had a basic combustion system which allowed a considerable amount of heat energy to escape up the chimney as unburned gases and particulates smoke Pacific Energy ha...

Page 15: ...e Pin SSER 125001 14 Baffle Gasket SUMB 31396 15 Flame Shield c w Bolt and Nut SUMB 31155 16 Door Catch WODC 1461A 17 Secondary Air Box Gasket 5068 3237 18 Secondary Air Box c w Gasket SUMB 3140 19 Pe...

Page 16: ...001 15 Baffle Gasket SUMB 31396 16 Flame Shield c w Bolt and Nut SUMB 31155 17 Air Shutter Assembly SUMM 531 18 Ash Dump Assembly WODC 2261 19 Secondary Air Box Gasket 5068 3237 20 Secondary Air Box c...

Page 17: ...h remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up align the pedestal mountin...

Page 18: ...ous cut size bricks If your heater came with an ash cleanout system or an optional one is being in stalled one brick D will not be needed for your installation With the woodstove in the upright positi...

Page 19: ...127 MM I 0 INCHES 0 MM MOBILE HOME INSTALLATION USING DOUBLE WALL CONNECTOR INSTALLATION EN MAISON MOBILE UTILISANT UN RACCORD DE MUR DOUBLE WN 16391 ETL 4001507 INSTALLEZ ET UTILISEZ SELON LES INSTRU...

Page 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Reviews: