background image

12 SUPER-SD1 

071111-20

Optional 
Blower

The optional blower kit (kit #WODC.BLOW) is equipped 
with a three prong power cord and may be installed at 
any time. Follow installation instructions supplied with the 
kit. Route power supply cord away from heater.

Electrical rating:  115 volts A.C.-1.02 amps.
Fan output rating:  125 CFM

Blower Operation

Proper blower speed matched with air control setting 
will ensure peak performance from your stove. Operate 
as follows:
 

- Air control set to "L" (low), operate blower speed 
control on "Low".

 

- Air control set between "L" and "H" (low and high), 
operate blower speed control at desired setting.

Automatic:

  To operate the blower automatically, set the 

rocker switch on the side of the fan housing to "Auto" 
and set the speed control to desired setting. This will al-
low the fan to turn on as the stove heats up to operating 
temperature. It will also shut the blower off after the fi re 
has gone out and the unit cooled to below a useful heat 
output range.

Manual:

  To manually operate the blower, set the rocker 

switch to "Man" and set the speed control to desired set-
ting. This will bypass the sensing device and allow full 
control of the blower.
Switching from "Auto" to "Man" or selecting speed may 
be done anytime.

Optional Outside Air Adaptor

The adaptor is only required if the blower kit is to be in-
stalled and outside combustion air to be ducted to rear 
of pedestal.

Installation:

Remove blower kit if already installed.  Place adaptor with 
the 4" round hole facing up and opposite end covering 
the room air knockout hole on the back of the pedestal.  
Mark attachment holes on pedestal base and drill with 
1/8" bit.  Attach with #8 x 1/2" screws and reinstall fan.  
Combustion air duct from outside can now be attached 
to the 4" round collar.

Summary of Contents for SUPER 27 SPECTRUM

Page 1: ...llationinstructions Contact local building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmen...

Page 2: ...eosote 4 Formation and Need for Removal 4 Chimney Fires 4 In Case of a Chimney Fire 4 Avoiding a Chimney Fire 4 Assembly 5 Crate Removal 5 Optional Ash Cleanout System Install first 5 Pedestal Kit 5 L...

Page 3: ...maintained in good condition Periodically inspect seals and replace if necessary Follow instructions included in the DR31 WDGKIT kit obtainable from your nearest Pacific Energy dealer 5 DOORGLASS Dono...

Page 4: ...t be lived with Regular inspection and clean ing is the solution The use of dry seasoned wood and ample combustion air will help to minimize the buildup Chimney Fires The result of excessive creosote...

Page 5: ...to bottom pallet 4 Place stove body carefully on its back 5 Using two 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Optional Ash Cleanout...

Page 6: ...ooring using two 1 4 x 2 or longer lag screws Mobile Home Installation Warning Under no circumstances is this heater to be installed in a makeshift or temporary manner It may be fired only after the f...

Page 7: ...Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA ONLY Security Pro Jet ICC Selkirk Energy...

Page 8: ...tallation must meet all local codes Do not connect this unit to a chimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Us...

Page 9: ...o be secured to the structure to prevent dislodging of the air duct Outside air may also be ducted from outside throughthe4 diameterknockoutholeintherearofthe pedestal or leg kit ash box enclosure If...

Page 10: ...for the first 2 3 times it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting...

Page 11: ...ry replace with gasket 139 5availablefromyourPacificEnergydealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Exte...

Page 12: ...ill al low the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual...

Page 13: ...latch Excessive Creosote Buildup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t B...

Page 14: ...ant Nickel CAST 31RSNI 10 Door Handle Assembly WODC 4147C 11 Boost Manifold 4105 12 Firebrick Set BRIC SSERA 13a Brick Rail Left Right SSER RAILSET 14 Replacement Baffle Kit SSER DBAKIT 15 Baffle Pin...

Page 15: ...CAST 31NI Door Casting Radiant Nickel CAST 31RSNI 12 Door Handle Assembly WODC 4147C 13 Boost Manifold 4105 14 Firebrick Set BRIC SSERA 15a Brick Rail Left Right SSER RAILSET 16 Replacement Baffle Kit...

Page 16: ...anding the basic functions of this design Traditionalwoodstoveshadabasiccombustion systemwhichallowedaconsiderableamountof heat energy to escape up the chimney as un burned gases and particulates smok...

Page 17: ...ack 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facing up ali...

Page 18: ...18 SUPER SD1 071111 20 NOTES...

Page 19: ...L EXTENDED TO THE FRONT SIDES AND BACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LIS...

Page 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD 2975 Allenby Rd Duncan B C V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada...

Reviews: