©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
15
010515-20 ALT4
Chimney connector pipe should be disconnected from stove to clean and inspect. Only
if this is not possible should you remove baffle assembly.
DO NOT OPERATE WITH BAFFLE ASSEMBLY OR INSULATION REMOVED.
Removal
Remove retaining pin located at the rear top of the firebox, just below the
baffle. Remove rail extensions in front of Baffle. Lift baffle up and pull forward to discon-
nect from the supply tube. Tilt baffle sideways to drop down and remove from firebox.
Inspect gasket between baffle and supply tube. If necessary, replace with gasket SSER.1395
available from your Pacific Energy dealer. Re-install baffle assembly in reverse order. The
two side pieces of insulation must be tight against the siderails.
Baffle Removal
Disposal of Ashes
Ashes should be placed in a metal container with a tight fitting lid. The closed container of ashes
should be placed outside on a non-combustible floor or on the ground, well away from all combustible
materials, pending final disposal. If the ashes are disposed of by burial in soil or otherwise locally
dispersed, they should be retained in a closed container until all cinders have thoroughly cooled.
Other waste should not be placed in this container.