background image

2

ALT5.CPINSB  180314-24

Contents

Safety ................................................................................................. 3
Clearances ......................................................................................... 3

Masonry or Factory Built Fireplace ............................................ 3

Maintenance Checks.......................................................................... 4
Dimensions ........................................................................................ 6
Installation .......................................................................................... 7

Fireplace Specifi cations ............................................................. 7
Into a Masonry Fireplace ........................................................... 7
Full Flue Liner (Required in Canada) Fig #2 .............................. 8
Direct Flue Connection (Only permitted in USA) Fig #4 ............. 8
Into a Factory Built Fireplace ..................................................... 8
Surround Assembly and Installation ........................................... 10
Fan Removal/Installation ............................................................ 11
Fan Speed Controller Relocation ............................................... 12

Operation ........................................................................................... 14

Wood Selection .......................................................................... 14
How to Test Your Wood .............................................................. 14
Lighting the Fire ......................................................................... 14
Normal Operation ...................................................................... 14
Restarting After Extended or Overnight Burns ........................... 15
More Wood, More Heat .............................................................. 15
Proper Draft ................................................................................ 15
Ash Removal .............................................................................. 15
Disposal of Ashes ...................................................................... 15

Blower ................................................................................................ 15

Blower Operation ....................................................................... 15
Electrical Supply ........................................................................ 15

Creosote ............................................................................................ 16

Formation and Need for Removal .............................................. 16
Chimney Fires ............................................................................ 16
In Case of a Chimney Fire ......................................................... 16
Avoiding a Chimney Fire ............................................................ 16

Maintenance ...................................................................................... 17

Baffle Removal ........................................................................... 17

Replacement Parts ............................................................................ 18
Appendix A ......................................................................................... 19

Understanding & Operating Your Pacifi c Energy Stove .............. 19
Troubleshooting .......................................................................... 20

Firebrick Installation ........................................................................... 21

Label .......................................................................................... 23

Summary of Contents for T5

Page 1: ...TALLATION AND OPERATING INSTRUCTIONS TESTED and LISTED to ULC S628 UL 1482 Meets the U S Environmental Protection Agency s July 1990 Particulate Emission Standards SERIAL SAFETY NOTICE If this stove i...

Page 2: ...peed Controller Relocation 12 Operation 14 Wood Selection 14 How to Test Your Wood 14 Lighting the Fire 14 Normal Operation 14 Restarting After Extended or Overnight Burns 15 More Wood More Heat 15 Pr...

Page 3: ...on inspection requirements in your area Clearances Masonry or Factory Built Fireplace The minimum required clearances to surrounding combustible materials when installed into a masonry or factory buil...

Page 4: ...lanket Baffle Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Some warping of the baffle is normal up to 1 4 or 65cm Replace if the baffle has permanent warping greater than this...

Page 5: ...flush to an adjacent combustible floor Ember protection Combustible floor in front of the fireplace insert must be protected from hot embers by non combustible material extending 16 to the firing side...

Page 6: ...PINSB 180314 24 29 3 8 42 1 2 30 3 8 42 1 2 33 1 8 34 1 8 9 1 2 33 5 8 23 7 8 10 5 8 17 5 8 20 7 8 17 5 8 28 3 8 21 1 2 WITH REGULAR SURROUND WITH OVERSIZED SURROUND ALT5 INSERT ALT5 CLASSIC INSERT Di...

Page 7: ...me time have chimney swept The existing fireplace damper is to be locked open or removed completely WARNING Donotremovebricksormortarfromyourexisting fireplace Exception Masonry or steel including the...

Page 8: ...first chimney flue tile Seal around pipe Note A clean out door may be required under local codes when a direct flue connection is used Consult local codes 3 To mount optional rear leveling leg bolts p...

Page 9: ...he installation is complete do not seal surround to fireplace This will allow enough combustion air to enter the fireplace cavity and the Insert The knockouts in the casing sides and the O A cover can...

Page 10: ...s and washers in the mounting hardware kit found with the Surround Top Fig 10 5 Lay Surround sides flat on floor and align with Surround Top H Square the surround by aligning edges I on each side Fast...

Page 11: ...cket to the stove using a 7 16 socket or wrench Reverse steps 1 2 to install new fan Fig 17 7 Install fan shield as shown in Fig 13 Be sure to place the air inlet opening against the surround side 8 I...

Page 12: ...can be relocated to the left side by following the instructions below To make this as easy as possible it is suggested that this be done prior to fitting the surround and installation into the firepl...

Page 13: ...t is important to prevent damage to wires 7 Remove the control assembly from the ashlip bracket on the right hand side Flip it over and reattach on the left hand side of the ashlip Fig 25 Use the uppe...

Page 14: ...several pieces of dry kindling Add a few small pieces of dry wood on top 3 Ignite the paper and close the door 4 After the fire has established itself open the door and add a few small logs Close doo...

Page 15: ...uple of hours to relieve firebox and chimney deposits as well as any of the deposits on the glass More Wood More Heat Seasoned wood has approximately 7500 BTU s per pound If you put 10 pounds of wood...

Page 16: ...smoke densities occur when a large amount of wood is added to a bed of hot coals and the air inlet is closed The heated wood generates smoke but without ample air the smokecannotburn Smoke free clean...

Page 17: ...1 3 8 x 17 1 4 x 5 mm Ceramic glass must be used Do not substitute with any other type To remove broken glass undo the four retaining screws and remove the clamps noting position for re assembly Remov...

Page 18: ...r Catch 4740 Replacement Parts WHEN ORDERING INCLUDE PART NUMBER WITH DESCRIPTION 2 3 4 1 5 6 7 10 11 NOT SHOWN 19 15 19 20 21 1 1 ITEM DESCRIPTION PART NO 8 Glass Clamp Set 4 pc 4720 01 9 Replacement...

Page 19: ...s as a heat storage and the thermalinsulationkeepsthecombustionzonehot Active flamingtakesplaceduringthefirstpartoftheburn During this stage heat is stored in the mass of the unit and is later release...

Page 20: ...2 Door Gasket leakage Replace gasket Check latch Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Area too large 4 Poor insulation or open concrete Won t Burn Overnigh...

Page 21: ...ck Installation This package contains 18 full size firebricks as well as 1 cut size brick With the heater in the upright position install firebricks as follows Place firebricks on the bottom of the he...

Page 22: ...22 ALT5 CPINSB 180314 24 NOTES...

Page 23: ...IN CONDITIONS OF USE CREOSOTE BUILDUP MAY OCCUR RAPIDLY MADE IN CANADA F M A M J J A S O N D 2010 2011 2012 2013 2014 2015 U S ENVIRONMENTALPROTECTIONAGENCY CERTIFIED TO COMPLY WITH JULY 1990 PARTICUL...

Page 24: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD www pacificenergy net Technical Support 1 250 748 1184 2975 Allenby Rd Duncan B C V9L 6V8 Printed in Canada...

Reviews: