LMX SERIES™ OPERATION MANUAL
Entire Contents Copyright
2018 by Pacific Power Source, Inc. (PPS) • All Rights Reserved • No reproduction without written authorization from PPS.
LMX Series Power Source Operation Manual
Page 52 of 463
5
Unpacking and Installation
5.1
Unpacking
This equipment is heavy and requires two persons to lift or carry. To remove the
equipment from its packaging, use the handgrips on the sides for 5U and 8U chassis size
models to lift the unit from its packaging and place it on a suitable surface that is rated to
support the weight of the unit. Two persons are required to remove the LMX unit from its
packaging, one on each long side of the box.
If the unit was shipped with the optional external magnetics module (T-Option), it will be in
its own separate packaging.
NOTE:
THE MAGNETICS MODULE FOR, MODELS 140LMX, 160LMX AND 320LMX THROUGH
360LMX ARE
NOT
A ONE-PERSON LIFT, AND MUST BE LIFTED BY TWO OR MORE
INDIVIDUALS IN ORDER TO REDUCE CHANCE OF PHYSICAL INJURY.
5.2
Inspection
The LMX Series® of AC power sources are carefully inspected before shipment. If instrument
damage has occurred during transport, please inform Pacific Power Source’ nearest sales
and service office or representative.
Refer to "check line voltage" to check the line voltage selection and fuse type.
5.3
Lifting and Carrying Instructions
WARNING
THIS UNIT IS HEAVY.
Two persons are required to lift or carry this unit. DO NOT attempt to lift
alone. DO NOT use the front panel rack handles alone to lift this unit. The unit must be supported
in front and back when carrying.
AVERTISSEMENT
CET EQUIPEMENT EST LOURD. Deux personnes sont requises pour transporter ou soulever cet
équipement. NE PAS tenter de soulever ou déplacer seul. NE PAS utiliser les poignées en face
avant pour soulever l´appareil. L´équipement doit être pris en charge à l´avant et à l´arrière pour
le transport.