SECTION 4 OPERATION
85
4.3.1 ROUTINE POWER-UP, MODELS 390 and 3120-AMX
This paragraph describes the procedure used to turn on the Models 390 and 3120-AMX
Power Sources after if has been verified that the installation is correct. The steps below are
the recommended order of operation.
1.
Set the OUTPUT POWER switch of the Master Chassis (which has the controller
installed) to the
OFF
position. The Output Power Switch of the Slave chassis is
disabled. Switch the INPUT POWER switch of the Master chassis to the
ON
position. Switch the INPUT POWER switch of the Slave chassis to the
ON
position.
This sequence is recommended so that the power amplifiers of the system operate in
a controlled manner during power-up. The controller will light up and begin to
display output data. The value of the output parameters will be set for the same
values as when the unit was last turned off.
2.
Set the OUTPUT POWER switch of the Master chassis to the
ON/AUTO
position
and the OUTPUT ENABLE button of the UPC must be
ON
.
CAUTION
DO NOT CONNECT ANY LOADS TO THE OUTPUT OF THE POWER SOURCE UNTIL THE
OUTPUT VOLTAGE AND FREQUENCY HAVE BEEN VERIFIED AS CORRECT.
APPLICATION OF IMPROPER VOLTAGE OR FREQUENCY CAN DAMAGE USER LOADS.
WARNING
LETHAL VOLTAGES ARE PRESENT AT THE OUTPUT TERMINALS OF THIS MACHINE!
Summary of Contents for AMX Series
Page 1: ...AMX SERIES AC POWER SOURCE OPERATION MANUAL PACIFIC POWER SOURCE ...
Page 2: ......
Page 8: ......
Page 114: ......