7
3
6
2
3
Lamp test
All segments and LEDs
light up.
Software revision
Low-level selected
Low-level selected from the
low-level menu.
Software number
Display sequence at start up (every parameter is displayed for 2 seconds)
in.flo dry-fire protection
At start up, the in.flo’s detector verifies the water flow according to the following sequence:
The Pump 1 or the circulation pump runs for a period of 2 to 5 minutes.
The display will show “- - -“ during the flow verification. After this time, the system confirms if the flow is adequate or not.
If the flow is sufficient, the temperature of the water is displayed on the keypad screen. When the water has reached the
set point temperature plus 0.45°C (0.8°F) the water heater turns off.
5. Before filling your spa for the first time, remove the pump compartment door, ensure the hose bibb/drain tap (located at the
bottom of one of the front corners) is closed and check that the unions on either side of the pump are hand tight and the
knife valves (if installed) are fully open.
Close all drains and fill the spa with water by removing the filter lid, weir, skimmer basket and filter. Then insert the end of a
garden hose into the filter canister (this will avoid airlocks – do not fill the spa by pouring water into the shell) and begin filling
the spa to the recommended level. The water level of the spa should be approximately one inch above the highest jet in the
spa, at least two third’s of the way up the opening of the skim filter. Low water levels can cause damage to the pump and
heater unit.
Check all connections for leaks and hand tighten union fittings as required. The equipment may shift slightly during
transportation, making hand tightening of the union fittings difficult. Should this occur, simply loosen or remove the screws
securing the pump and module to the base and shift the components into alignment so that the unions can be hand
tightened.
note
:
Never fill your spa with soft water. Soft water makes it extremely difficult to maintain the proper water chemistry and
may cause the water to foam, which will ultimately harm the finish of the spa and void your warranty.
6. Install the filtering equipment. Reinstall the filter, skimmer basket, weir and filter lid once the spa is filled and check that the
filter is installed correctly.
7. After the spa has been filled with water (when the water level is adequate to avoid pump damage) and the equipment
compartment door is secured, power must be applied to the spa:
∙ First, activate power to the sub panel from the main house panel (turn on circuit breaker at the main electrical panel).
∙ Open the door of the electrical sub panel and reset the GFCI breakers.
The breaker should be tested prior to each use:
∙ Push the “TEST” button on each GFCI breaker and observe it click OFF.
∙ Wait 10 seconds, then push the breaker switch to the OFF (down) position (completely disengaged),
then push the breaker switch to the ON (up) position.
∙ Close and secure the sub panel door.
note
:
Do not expect to feel hot water immediately coming from the jets. The highly efficient heaters are designed to provide
cost-saving, low-level heating. Initially the spa will take approximately 7– 8 hours to read the set point. This performance figure
is based on an average sized, triple layer insulated spa with a four inch thick insulated spa cover. It also depends on spa
capacity, fill water temperature and ambient temperature.
START UP GUIDE Y SERIES
note
:
This set up should be performed by the dealer or spa technician when installing the spa and powering it up for the first time
Power Up and Breaker Setting
.
IMPORTANT Please read the following before starting the device.
Verify that all accessories are linked to the ground lug and connected to the to the control
system.
A minimum flow of 68 LPM (18 GPM) is required. Ensure that all valves are open in the spa
plumbing and that the water flow is sufficient between the main pump and the water heater.
Turn on the breaker.