©2020 PACE Inc., Vass, North Carolina,
All Rights Reserved
Page
7
Unpacking & Initial Set-up
Unpacking
1.
Attention: Packaging must be saved for all future shipping requirements!
– This
includes the entire shipping container and all internal foam packaging material. It will
be needed, should the unit need to be returned to PACE for any reason.
2.
Warning! Lift machine by frame. Do not lift by board holder rail(s)! Serious
damage to machine will occur, voiding warranty.
– There are cutouts in the base
foam insert for 2 people to have easy access to the hand holds located at the front and
rear of the machine frame.
3.
Do not cut reusable band!
– Band is required for all returns to immobilize heater
head during shipment. Use a flat-blade screwdriver to pry buckle pawl away from
band and release tension.
4.
Prior to use, remove red shipping cushion by rotating micrometer head
clockwise until cushion can be easily removed.
– Retain cushion and reinstall if
unit is transported. The board holders utilize springs to maintain force against the Y-
axis adjustment micrometer spindle point. Vibration during shipment can cause the
board holder to bounce, potentially loosening or damaging the micrometer.
5.
Sodr-Cam Installation Instructions
– For IR3100/4100 units, the Sodr-Cam arm
assembly ships detached from the unit and must be installed by the customer as
detailed in the
5050-0597
installation instructions included in the package.
6.
Prism Shipping Screw Warningl
– This label is affixed to the alignment camera
cover and reads as follow: “Using 3/32” hex driver, loosen these two shipping screws
½ turn (do not remove) prior to connecting power to the machine or verifying prism
alignment. Retain this label for future use. Re-tighten screws and reapply label if
machine is shipped or transported.”