150-458-100-05
Using
This
Manual
HRE-458 List 1, List 1B, and List 2
February 23, 2000
iii
U
SING
T
HIS
M
ANUAL
Two types of messages, identified by icons, appear in the text.
I
NSPECTING
S
HIPMENT
Upon receipt of the equipment:
•
Unpack each container and inspect the contents for signs of damage. If the equipment has been damaged in
transit, immediately report the extent of damage to the transportation company and to ADC. Order
replacement equipment, if necessary.
•
Check the packing list to ensure complete and accurate shipment of each listed item. If the shipment is short
or irregular, contact ADC as described in the Warranty located inside the back cover. If you must store the
equipment for a prolonged period, store the equipment in its original container.
Notes contain information about special circumstances.
Cautions indicate the possibility of equipment damage or the possibility of personal injury.