363-704-104-01, Revision 01
Installation and Test
FLC-704 List 4
June 22, 1998
9
Verify Installation
After the PG-Flex system is powered up and HDSL communication is synchronized:
1
Verify that the front panel ACTIVE indicators are all OFF and the FAULT indicator is OFF (no calls are in
progress).
2
Test the loop start circuits, as follows:
•
Place an outgoing call for each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications).
•
Place an incoming call to each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications).
3
Test the ground start circuits, as follows:
•
Place an outgoing call for each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications).
•
Place an incoming call to each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications).