background image

3

PZ Series 150-250-500-1000 Shaker Cleaner 

Operation

During normal operation, dust-laden air enters the 

collector through the dirty-air inlet. The velocity is 

reduced and natural pre-separation, caused by the 

effects of gravity, takes place and heavier particulate 

falls directly into the collection bin or hopper. Fine 

particles collect on the outside surface of the filter bag 

and filtered air passes to the center of the bag and 

discharges through the clean-air outlet. 

The Unimaster is an intermittent-duty collector, which 

means that cleaning starts when the fan is turned OFF 

and the appropriate fan run-down time is complete. 

The solid-state timer automatically starts the cleaning 

sequence 75-seconds after the fan is turned OFF. This is 

the fan run-down time. Power to controls must remain 

ON to operate the cleaning mechanism. The vibration 

motor starts and filter cleaning begins for a preset time 

of 30-seconds.

Collector Operation

fan

clean-air 

plenum/

silencer

clean-air outlet

filter bags and 

Shaker 
Motor

dirty-air 

plenum

dirty-air inlet

Normal Operation*

*Doors not shown on collector for illustrative purposes

Hooper

Dust Bin

Summary of Contents for PZ Series

Page 1: ...rate or perform maintenance on this collector until you have read and understood the instruction and warnings contained within this manual PZ Series Dust Collector PZ 150 250 500 1000 Shaker Cleaner M...

Page 2: ...nt This manual has been supplied to assist with the installation operation and maintenance for the collector purchased Please read the manual before installing operating or performing maintenance on t...

Page 3: ...uipment 5 Hopper and Leg Installation 5 Provisional Anchor Bolt Recommendations 6 Collector Installation 6 Electrical Wiring 8 Inlet Assembly 8 Preliminary Start Up Check 12 Maintenance Information 13...

Page 4: ...1 Safety Communication...

Page 5: ...eration Other options include explosion relief vents static grounding weather hoods and caster frames Purpose and Intended Use Misuse or modification of this equipment may result in personal injury Do...

Page 6: ...et The Unimaster is an intermittent duty collector which means that cleaning starts when the fan is turned OFF and the appropriate fan run down time is complete The solid state timer automatically sta...

Page 7: ...ollector will compromise collector performance Inspect collector to ensure all hardware is properly installed and tight prior to operating collector Installation Use proper equipment and adopt all saf...

Page 8: ...ices must be adequately supported to prevent severe personal injury and or property damage When hazardous conditions or materials are present consult with local authorities for the proper location of...

Page 9: ...0 to 70 Hopper and 55 Gallon Drum Base Styles 1 Prepare the foundation or support framing in the selected location Locate and install anchors 2 Lift collector into position over the anchor bolts and l...

Page 10: ...bolts using customer supplied hardware Typical Installation PZ 500 to 1000 or Two Piece Shipment 5 Remove the lifting brackets from the top of the base assembly 6 Apply two strips of sealant or caulk...

Page 11: ...with back inlets Contact Pakzy if additional changes are necessary 1 Remove the inlet blank from the specified location 2 Replace damaged sealant if necessary 3 Secure inlet to collector using the ha...

Page 12: ...nergized and the shaker motor runs for approximately 30 seconds Typical Wiring Diagram Three Phase Power Supply Shaker motor contactor is de energized and the timer resumes inactive status Note Before...

Page 13: ...10 230 Volt Single Phase Power Supply Wiring Diagram...

Page 14: ...11 PZ Series 150 250 500 1000 Shaker Cleaner 115 Volt Single Phase Power Supply Wiring Diagram...

Page 15: ...are properly wired and all service switches are in the OFF position 7 Check that all optional accessories are installed properly and secured 8 Turn power ON at source 9 Turn fan motor ON 1 Check all...

Page 16: ...ipment and procedures Note the standard collector is not equipped with access platforms unless noted on the specification drawings Electrical service or maintenance work must be performed by a qualifi...

Page 17: ...bag pockets into the shaker bar slots 6 Push the filter assembly the remaining distance into the collector and check that all pockets are firmly seated in the shaker bar 7 Lift retention handles for U...

Page 18: ...h and low pressure ports on the side of the gauges 3 Attach the mounting bracket using three 6 32 x 1 4 in screws supplied 4 Mount the gauge and bracket assembly to the supporting structure using two...

Page 19: ...dia bonding and grounding components are available for UMA collectors equipped with antistatic filter bags 1 If the collector is ordered with antistatic filter bags the grounding lug and internal comp...

Page 20: ...vented equipment outside buildings and away from normally occupied areas Explosion vents should be inspected regularly to confirm physical and operational condition Replace any damaged parts immediate...

Page 21: ...FF and allow the controller to perform several complete cleaning cycles Replace filter bags Motor speed low Check all supply voltage phase and motor connections Fan rotation backward Check and correct...

Page 22: ...______________________ Collected Dust _________________________________________________________________________ Dust Properties Kst_______________Pmax______________MIE____________MEC_________________...

Reviews: