43
ENGLISH
004778140 - 15/01/2020 - PN - Italy
4
Handling and transportation
The stove is delivered complete with
all the parts provided.
Pay attention to the tendency to
unbalance the stove.
The centre of gravity of the stove is
moved towards the front.
Bear in mind the above also when
moving the stove on the transportation
support.
During lifting, avoid jerking or abrupt
movements.
Make sure the forklift truck has a
capacity greater than the weight of
the stove to be lifted.
The full responsibility of the lifting of
loads lies on the person handling the
lifting equipment.
5
Preparation of the installation
site
5.1 General considerations
In the following paragraphs there are
some guidelines to follow in order to
obtain the maximum performance of
the product purchased.
The following instructions are
nevertheless subject to compliance
with any laws and national, regional
and municipal regulations in force
in the country where the product is
installed.
Installation must be performed by
qualified personnel in compliance with
the EN 10683 standard.
5.2 Safety Precautions
The responsibility of the works carried
out in the area where the stove will
be installed falls, and remains, on
the user; the latter is also entrusted
with the execution of the inspections
related to the installation solutions
proposed.
The user must comply with all local,
national and European safety regulations.
The appliance must be installed on
floors with adequate load bearing
capacity.
The stove removal and installation
instructions must only be performed
by specialist technicians. It is always
recommended that users contact our
after sale service to request qualified
technicians.
In the case other technicians are
involved, it is recommended to verify
their actual abilities. The person in
charge of the installation, before
starting assembling or disassembling
of the stove, must comply with the
safety precautions required by law
and in particular:
• they must not operate in adverse
conditions
Make sure that children do not play
with the packaging components
(e.g. films and polystyrene).
Danger of suffocation!
4.1 Removal from the transport pallet
To remove the stove from the transport
pallet, follow the instructions in the
annexed “Product Booklet”.
Summary of Contents for ECOFIRE JACKIE IDRO N
Page 23: ...23 ITALIANO 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie idro N F P H L G C D...
Page 25: ...25 ITALIANO 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 33: ......
Page 54: ...54 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie hydro N F P H L G C D...
Page 56: ...56 004778140 15 01 2020 PN Italy Fig 6 4b Jackie hydro N L M J N K D C...
Page 64: ......
Page 85: ...85 DEUTSCH 004778140 15 01 2020 PN Italy Abb 6 3 2b Jackie Idro N F P H L G C D...
Page 87: ...87 DEUTSCH 004778140 15 01 2020 PN Italy Abb 6 4b Jackie Idro N L M J N K D C...
Page 95: ......
Page 116: ...116 004778140 15 01 2020 PN Italy Fig 6 3 2b Fig 6 3 2c Jackie idro N F P H L G C D...
Page 118: ...118 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 126: ......
Page 147: ...147 ESPA OL 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie idro N F P H L G C D...
Page 149: ...149 ESPA OL 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 157: ......
Page 158: ......
Page 159: ......