6.3.3 Mode of loading/replenishing of the stove
system fluid (Fig. 6.4)
Before performing the operations
listed below, be sure to have connected
both the delivery and return pipes (see
par. 6.3.2).
The options are as follows:
1) Connect a water pipe coming from
the water mains to the filling tap L,
open the vent valve B (Fig. 6.3.1), open
the filling valve M, making the water
flow until the stove is completely filled.
Close the vent valve and wait for the
minimum operating pressure (1 bar)
to be reached, which can be checked
from the pressure gauge on the stove.
2) Connect a water pipe coming from
the water mains to the system drain
J, open the vent valve, open the
drain valve K, making the water flow
until the stove is completely filled.
Close the vent valve and wait for the
minimum operating pressure (1 bar)
to be reached, which can be checked
from the pressure gauge on the stove.
3) If the domestic system is
equipped with manual or automatic
replenishment, the stove can be filled
through the delivery and return pipes.
T h e n o p e n t h e v e n t va l v e B
(Fig. 6.3.1), open the bypass valve on
the anti-condensation valve N, making
the water flow from the system
until the stove is completely filled.
Close the vent valve and wait for the
minimum operating pressure (1 bar)
to be reached, which can be checked
from the pressure gauge on the stove.
Close the bypass valve in the anti-
condensation valve (Fig. 6.4a).
Fig. 6.4a
Summary of Contents for ECOFIRE JACKIE IDRO N
Page 23: ...23 ITALIANO 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie idro N F P H L G C D...
Page 25: ...25 ITALIANO 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 33: ......
Page 54: ...54 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie hydro N F P H L G C D...
Page 56: ...56 004778140 15 01 2020 PN Italy Fig 6 4b Jackie hydro N L M J N K D C...
Page 64: ......
Page 85: ...85 DEUTSCH 004778140 15 01 2020 PN Italy Abb 6 3 2b Jackie Idro N F P H L G C D...
Page 87: ...87 DEUTSCH 004778140 15 01 2020 PN Italy Abb 6 4b Jackie Idro N L M J N K D C...
Page 95: ......
Page 116: ...116 004778140 15 01 2020 PN Italy Fig 6 3 2b Fig 6 3 2c Jackie idro N F P H L G C D...
Page 118: ...118 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 126: ......
Page 147: ...147 ESPA OL 004778140 15 01 2020 PN Italy Fig 6 3 2b Jackie idro N F P H L G C D...
Page 149: ...149 ESPA OL 004778140 15 01 2020 PN Italy Fig 6 4b Jackie idro N L M J N K D C...
Page 157: ......
Page 158: ......
Page 159: ......