76
004778610 - 16/12/2020
8 COMMISSIONING
After positioning the appliance it is necessary to
perform the following operations:
8.1 Check refractory base
The refractory base supplied already assembled
must be inspected to check if the components
have moved or have been damaged during
transportation.
An incorrect levelling of the base would prevent
correct assembly of the remaining refractory
bricks.
To restore levelling of the bases, thicken where
necessary using the adhesive glass fibre supplied
8.2 Description and positioning of
the deflectors
No. Description
Quantity /
Dimension
1
Front lower panel
2 / 184x350
2
Rear lower panel
2 / 184x300
3
Front intermediate panel
4 / 184x210
4
Rear intermediate panel
2 / 184x184
5
Upper panel
2 / 184x235
6
O2RING
2 / -
Dimensions in mm.
1
3
5
6
2
4
3
6
Fig. 26
8.3 Assembly of the deflectors and
O-RING
For the numbering of the panels refer
to the paragraph “Description and posi-
tioning of the deflectors” on page 76.
1)
Open the door by pushing it upwards.
2)
Position the panels ((
5
) resting them on the
appropriate supports (
A
5
A
Fig. 27
3)
Position the O-RING (
6
) by inserting it into the
appropriate support.
4)
Position the panels (
3
) resting them on the
appropriate supports (
B
).
6
3
B
Fig. 28