5
6
4
230 mm
3
2
140 mm
FIG. 1
FIG. 3
FIG. 4
FIG. 2
7 COMMISSIONING AND USE
After having positioned the heater, it is necessary to perform the following actions:
7.1 FITTING THE DEFLECTORS AND O
2
RING (IF PROVIDED)
• Open the door.
•
Make sure that the flue inspection valve is in closed position with the rod placed in the suitable bracket (Fig. 1).
•
Insert in sequence the deflectors and O2 Ring as shown in the diagram (Fig. 2-Fig. 3-Fig. 4).
40