ITALIANO
ENGLISH
FRANÇAIS
004778740 - 14/06/2021
69
DEUTSCH
ESPAÑOL
Double duct
Fig. 33
Single duct
Fig. 34
7.5 Making technical holes on the
cladding
The cladding must only be done by qualified
personnel.
Technical holes must be made on the cladding
and on the hood for:
A)
the display housing;
B)
the air vents;
C)
the heat exhaust ventilation in the hood;
D)
the ventilation of the cladding on the base;
E)
pellet loading opening
The holes must comply with the measurements
indicated in the figure:
115
65
295
295
295
295
C
B
A
E
E
D
Fig. 35