004778930 - 06/12/2021
55
ITALIANO
DEUTSCH
ENGLISH
FRANÇAIS
ESPAÑOL
8.4 checking the cast iron base
The cast iron base is supplied preassembled and
must be inspected to see if any components have
moved or been damaged during transportation.
An incorrect levelling of the base would prevent
correct assembly of the remaining refractory
bricks.
8.5 First ignition
The first ignition must be carried out
by the installer.
Before commissioning, remove the
stickers and packaging inside the fire
box and the external stickers applied to
the glass.
The first lighting operation is a fundamental op-
eration, used to test the product in full function,
and to gradually evaporate the water used in the
construction mixtures, which will make it resist-
ant and long-lasting.
First lighting must be carried out with
reduced loads (approximately 2 kg/h),
keeping the appliance on for at least
4 hours at low speeds. Proceed with
these feed rates for at least three days
before using the appliance at its full
capacity. This will allow for the evap-
oration of any moisture accumulated
in the refractory elements when not
used.
During the first ignition of the item,
unpleasant odours or fumes may be
generated due to the evaporation or
drying out of the materials used, and
water may seep from grouting. This
phenomenon will gradually disappear.
For this reason, it is advisable to keep rooms well
ventilated when igniting for the first time.
8.6 combustion
The wood-fired appliance has been designed for
intermittent combustion. This means the prod-
uct will need to be periodically loaded within a
time period that guarantees complete burning
of the previous load until nothing is left but burn-
ing embers. Operation
When handling hot parts (e.g. door)
use the supplied glove.