cod. 00 477 2250 - 11/2013 - PN - Italy
49/172
ENGLISH
INSTALLATION
6.5 CREATION OF UTILITY HOLES ON
CLADDING
!
Utility holes must be made in the cladding for the
following (Fig. 6.6.1):
A. loading of pellets onto hood;
B. heat release in hood;
C. ventilation of cladding on base;
6.6 CONNECTION TO SYSTEMS
6.6.1
Electrical connection
Simply connect the stove to the electricity mains
with the plug supplied.
)
The electrical connection (plug) must be easy to
access also after the stove has been installed.
If the power lead is damaged it must be replaced
electrician to prevent all risks.
6.6.1.1 Earthing
breaker as provided for by current laws (Fig. 6.6.2).
6.6.2 Control panel installation
'
using box “
A
” or recessed using box “
B
” (not
included) (Fig. 6.6.3).
Do not install the recessed box on the hood.
)
Place the passage of the cable between the panel
and the electronic card so that it is not damaged by
temperature.
Connect the cable between the terminals of the
electronic card and the control panel before closing
the boxes.
A
B
C
Fig. 6.6.1
Fig. 6.6.2
Fig. 6.6.3
1
2
3
4
1
2
3
4